WELL · 42-431-31356 · DISTRICT 8

Terry 6 #3

N

Sterling County  · Vertical

Terry 6 #3 (API 42-431-31356) is a permitted well in Sterling County filed by Dorchester Exploration, Inc.; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1982 and 1983, permitted to 8,950 ft.

Completion filings report 3 formation tops, including T. Leonard, T. Cisco, T. Canyon.

Operator of record

Dorchester Exploration, Inc.

Houston, TX · P-5 Y, filed Feb 12, 1988 · 200 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsBurk Royalty Co., Ltd.through Apr 2026
Latest permitDorchester Exploration, Inc.Sep 27, 1983
8,950
total depth, ft
4
permits on file
Sep 27, 1983
last permit issued
—
completed
0
cumulative oil, bbl
282K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Terry G-10-107966Conger (Penn)Burk Royalty Co., Ltd.10282KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 2,448 · prior 12 2,618(-6%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Cometra, Inc.Jan 1993 → Feb 1997
  2. 2Lomak Production CompanyMar 1997 → Aug 1998
  3. 3Range Production CompanySep 1998 → Jul 2014
  4. 4EQT Production Texas, LLCAug 2014 → Jun 2018
  5. 5Stanolind Production LLCJul 2018 → Dec 2020
  6. 6Slant Operating, LLCJan 2021 → Dec 2021
  7. 7Burk Royalty Co., Ltd.Jan 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
214736-99DrillDorchester Exploration, Inc.Sep 19, 1983Sep 27, 1983—8,950
205066-99DrillDorchester Exploration, Inc.Jul 25, 1983Jul 25, 1983Jul 30, 19838,950
177689-99DrillDorchester Exploration, Inc.Sep 19, 1983Nov 9, 1982—8,950
151644-99DrillDorchester Exploration, Inc.Feb 17, 1982Feb 17, 1982—8,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-107966————

Formation tops

As filed on W-2/G-1. Subsea from 2,506 ft elevation.Download CSV →

FormationMD ftSubsea
T. Leonard5,086-2,580
T. Cisco6,748-4,242
T. Canyon7,101-4,595

Perforations

Perforated and open-hole intervals.

FromToType
7,2057,233Perforated
8,6368,658Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,920111,150 S
27,163——
4.58,7007.875400 S
4.58,7017.8751,820 S
4.58,701—1,820 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 29, 1984Jan 24, 1984—
00Jan 12, 1984Jan 24, 1984—
00Jan 12, 1984Sep 14, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43131356, documented in the API reference.