WELL · 42-431-31788 · DISTRICT 8

Batjer #1

Plugged

Sterling County · Batjer (Canyon-Cisco) field  · Vertical

Batjer #1 (API 42-431-31788) is a plugged well in Sterling County, plugged October 10, 1988, last operated by Fasken Barbara.

The RRC has issued one drilling permit, issued February 12, 1986, permitted to 9,900 ft.

It was permitted by Fasken, David and has since transferred to Fasken Barbara on the wellbore schedule.

Completion filings report 6 formation tops, including Queen, San Andres, Wolfcamp, Cisco.

Operator of record

Fasken Barbara

Permitted by Fasken, David; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Feb 9, 1996 · 87 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFasken Barbara
Production reportsnone
Latest permitFasken, DavidFeb 12, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,900
total depth, ft
1
permits on file
Feb 12, 1986
last permit issued
Jun 14, 1986
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 14, 1986
Shut in
—
Plugged
Oct 10, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
297474-99DrillFasken, DavidFeb 4, 1986Feb 12, 1986Mar 31, 19869,900

Formation tops

As filed on W-2/G-1. Subsea from 2,649 ft elevation.Download CSV →

FormationMD ftSubsea
QueenQUEEN SAND1,980669
San Andres2,130519
Wolfcamp6,525-3,876
CiscoCISCO-CANYON6,950-4,301
Fusselman9,042-6,393
Ellenburger9,230-6,581

Perforations

Perforated and open-hole intervals.

FromToType
7,0157,023Perforated
7,1787,181Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,23812.251,150 S
4.58,3027.875915 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 16, 1986Jun 20, 1986Yes
00Jul 15, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43131788, documented in the API reference.