WELL · 42-431-32595 · DISTRICT 8

Johnstone #1

Plugged

Sterling County  · Vertical

Johnstone #1 (API 42-431-32595) is a plugged well in Sterling County, plugged February 2, 1993, last operated by Mulloy Operating, Inc..

The RRC has issued 2 drilling permits between 1992 and 2008, permitted to 8,800 ft.

Operator of record

Mulloy Operating, Inc.

Midland, TX · P-5 Active, filed Oct 29, 2025 · 52 permits on file · (432) 687-0323

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMulloy Operating, Inc.Aug 29, 2008
8,800
total depth, ft
2
permits on file
Aug 29, 2008
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2008 THROUGH Feb 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Feb 2, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnstone O-10-40297WildcatGaedeke Oil & Gas Operating, LLC100Nov 2008 – Feb 2012

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
668700-99ReenterMulloy Operating, Inc.Aug 8, 2008Aug 29, 2008Nov 4, 20088,400
406858-99DrillMariah Energy Corp.Dec 4, 1992Dec 11, 1992Jan 16, 19938,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-40297————

Perforations

Perforated and open-hole intervals.

FromToType
6,9246,927Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,02411—
4.58,1507.875815 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 22, 2010Sep 9, 2010Yes
00Nov 5, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.