WELL · 42-431-33122 · DISTRICT 8

McEntire 158 1 #1

Plugged

Sterling County · Credo E. (Cisco Up.) field  · Vertical

Mcentire 158 1 #1 (API 42-431-33122) is a plugged well in Sterling County, plugged October 27, 2004, last operated by Atropos Exploration Company.

The RRC has issued one drilling permit, issued September 16, 2004, permitted to 8,100 ft.

It was permitted by Atropos Exploration Company and has since transferred to Atropos Exploration Company on the wellbore schedule.

Operator of record

Atropos Exploration Company

Permitted by Atropos Exploration Company; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitAtropos Exploration CompanySep 16, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,100
total depth, ft
1
permits on file
Sep 16, 2004
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 27, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
551057-99DrillAtropos Exploration CompanySep 15, 2004Sep 16, 2004Oct 15, 20048,100

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000110202W-14 DisposalCanceled Nov 21, 202225,0002,6155,230–5,970

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43133122, documented in the API reference.