WELL · 42-431-33229 · DISTRICT 8

Clark L. C. #40

Y

Sterling County · Clark (San Andres) field · Producing  · Vertical

Clark L. C. #40 (API 42-431-33229) is a well in Sterling County operated by Gilstrap Joel, completed May 6, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 1, 2008, permitted to 1,400 ft.

It was permitted by Levens, C. H. and has since transferred to Gilstrap Joel on the wellbore schedule.

Completion filings report 2 formation tops, including San Andres, San Angelo.

Its lease has reported 1.25M barrels of oil and 145 mcf of gas since January 1993, last reporting in July 2026. The lease carries 30 wells, so these are lease totals, not this well alone.

Operator of record

Gilstrap Joel

Permitted by Levens, C. H.; the EWA schedule now lists a different operator.

Water Valley, TX · P-5 Y, filed Jun 4, 2026 · (325) 763-8997

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGilstrap Joel
Production reportsGilstrap, Joelthrough Apr 2026
Latest permitLevens, C. H.May 11, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,400
total depth, ft
2
permits on file
May 11, 2009
last permit issued
May 6, 2013
completed
1.25M
cumulative oil, bbl
145
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 6, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 30 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Clark, L. C. O-10-618Clark (San Andres)Gilstrap, Joel301.25M145Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 15,168 · prior 12 16,882(-10%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Levens, C. H.Jan 1993 → May 2010
  2. 2C. H. Levens, Inc.Jun 2010 → Jul 2024
  3. 3Gilstrap, JoelAug 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
652540-98DrillLevens, C. H.Apr 27, 2009May 11, 2009May 28, 20081,400
652540-99DrillLevens, C. H.Jan 7, 2008Apr 1, 2008May 28, 20081,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-618————

Formation tops

As filed on W-2/G-1. Subsea from 2,206 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres8601,346
San Angelo1,1301,076

Perforations

Perforated and open-hole intervals.

FromToType
1,0181,022Perforated
1,1301,132Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62532011275 S
5.51,2867.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 30, 2015May 23, 2013—
00Jan 10, 2014Oct 11, 2011—
00Jan 27, 2010Aug 21, 2008Yes
00Dec 1, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000098375H-1 InjectionCanceled Sep 16, 20131,5005501,100–1,220

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43133229, documented in the API reference.