WELL · 42-431-33252 · DISTRICT 8

Stewart #501

N

Sterling County  · Vertical

Stewart #501 (API 42-431-33252) is a permitted well in Sterling County filed by Steller Energy & Investment Corp; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 2008 and 2013, permitted to 9,300 ft.

Completion filings report 7 formation tops, including Coleman Junction, Wolfcamp, Cisco, Strawb Ls.

Its 2 leases have reported 302K barrels of oil and 1.76M mcf of gas since February 2009, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Steller Energy & Investment Corp

Plano, TX · P-5 Y, filed Jan 8, 2021 · 160 permits on file · (972) 673-1215

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTrigeo Energy, LLCthrough Jul 2024
Latest permitSteller Energy & Investment CorpDec 3, 2013
9,300
total depth, ft
4
permits on file
Dec 3, 2013
last permit issued
—
completed
302K
cumulative oil, bbl
1.76M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stewart O-10-39559Spraberry (Trend Area)Trigeo Energy, LLC8264K1.58MJul 2009 – Jul 2026
Stewart O-10-39230Credo, N. (Wolfcamp)Steller Energy & Investment Corp138.2K181KFeb 2009 – Dec 2013

Gas, mcf lease total

Last 12 months 0 · prior 12 7,704(-100%)

02K4K202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 105(-100%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Steller Energy & Investment CorpFeb 2009 → Apr 2016
  2. 2Atoka Operating Permian, LLCMay 2016 → Sep 2023
  3. 3Trigeo Energy, LLCOct 2023 → Jul 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
772728-99Field transferSteller Energy & Investment CorpOct 29, 2013Dec 3, 2013Oct 8, 20129,300
745242-99RecompletionSteller Energy & Investment CorpJul 24, 2012Aug 28, 2012—9,265
673897-98DrillSteller Energy & Investment CorpJan 5, 2009Nov 17, 2008Nov 19, 20089,300
673897-99DrillSteller Energy & Investment CorpOct 27, 2008Nov 17, 2008Nov 19, 20089,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-39230————
—— O-10-39559————

Formation tops

As filed on W-2/G-1. Subsea from 2,565 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction4,082-1,517
WolfcampUPPER WOLFCAMP5,716-3,151
WolfcampLOWER WOLFCAMP6,852-4,287
WolfcampWOLFCAMP MARKER7,189-4,624
CiscoCISCO MARKER7,450-4,885
Strawb LS8,698-6,133
WoodfordWOODFORD SHALE8,964-6,399
Dated 3/4/2009——
Previously Reported on W-2——

Perforations

Perforated and open-hole intervals.

FromToType
6,0146,148Perforated
6,3966,519Perforated
6,9367,181Perforated
6,9367,699Perforated
7,5557,699Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,10712.25—
5.59,2607.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 4, 2013Nov 2, 2012—
00Jan 13, 2010Sep 8, 2009—
00May 5, 2009Mar 9, 2009Yes
00Apr 16, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43133252, documented in the API reference.