WELL · 42-431-33466 · DISTRICT 10
Gunter, Myrtle #4
Sterling County · Vertical
Gunter, Myrtle #4 (API 42-431-33466) is a former disposal or injection well in Sterling County, last operated by Omimex Energy, Inc.; its UIC permit is no longer active.
The RRC has issued one drilling permit, issued September 3, 2014, permitted to 1,900 ft.
Operator of record
Fort Worth, TX · P-5 Y, filed Jul 3, 2020 · 6 permits on file · (817) 296-7339
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Omimex Energy, Inc.Sep 3, 2014 |
- 1,900
- total depth, ft
- 1
- permits on file
- Sep 3, 2014
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 793761-99 | Drill | Omimex Energy, Inc. | Aug 8, 2014 | Sep 3, 2014 | — | 1,900 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-431-33466 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-431-33466 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jan 2018
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000111065 | H-1 Injection | Canceled Jul 24, 2018 | 1,200 | 520 | 1,040–1,500 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43133466, documented in the API reference.