WELL · 42-433-30894 · DISTRICT 8

Bullard, Van B. #1

Plugged

Stonewall County  · Vertical

Bullard, Van B. #1 (API 42-433-30894) is a plugged well in Stonewall County, plugged May 24, 1979, last operated by Sojourner Drlg. Corp..

The RRC has issued 3 drilling permits between 1978 and 1979, permitted to 6,460 ft.

Operator of record

Sojourner Drlg. Corp.

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSojourner Drlg. Corp.Apr 26, 1979
6,460
total depth, ft
3
permits on file
Apr 26, 1979
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 24, 1979

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
47290-99OtherSojourner Drlg. Corp.Apr 26, 1979Apr 26, 1979—3,481
44111-99OtherN. P. Energy CorporationMar 12, 1979Mar 12, 1979Aug 13, 19793,300
39355-99DrillN. P. Energy CorporationDec 21, 1978Dec 21, 1978Jan 23, 19796,460

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43330894, documented in the API reference.