WELL · 42-433-31286 · DISTRICT 7
Ellison Unit #3
Stonewall County · Stonewall (Tannehill) field · Vertical
Ellison Unit #3 (API 42-433-31286) is a plugged well in Stonewall County, plugged February 10, 2000, last operated by Lomax Operating Company Inc..
The RRC has issued one drilling permit, issued August 4, 1981, permitted to 3,000 ft.
It was permitted by Remuda Oil & Gas Corp. and has since transferred to Lomax Operating Company Inc. on the wellbore schedule.
Its 2 leases have reported 441K barrels of oil and 89 mcf of gas since January 1993, last reporting in July 2000. The leases carry 22 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Remuda Oil & Gas Corp.; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Sep 9, 2011 · 15 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lomax Operating Company Inc. |
| Production reports | Lomax Operating Company, Inc.through May 2000 |
| Latest permit | Remuda Oil & Gas Corp.Aug 4, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,000
- total depth, ft
- 1
- permits on file
- Aug 4, 1981
- last permit issued
- Oct 1, 1981
- completed
- 441K
- cumulative oil, bbl
- 89
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 1, 1981
- Shut in
- —
- Plugged
- Feb 10, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 22 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ellison Unit O-8-27045 | Stonewall (Tannehill) | Lomax Operating Company, Inc. | 18 | 441K | 79 | Nov 1993 – Jul 2000 |
| Galloway "A" O-8-16979 | Stonewall (Tannehill) | Anathema, Inc. | 4 | 269 | 10 | Jan 1993 – Jan 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Remuda Operating CompanyJan 1993 → Oct 1993
- 2Anathema, Inc.Nov 1993 → Dec 1994
- 3Lomax Operating Company, Inc.Jan 1995 → Aug 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 128475-99 | Drill | Remuda Oil & Gas Corp. | Aug 4, 1981 | Aug 4, 1981 | Sep 2, 1981 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-16979 | — | — | — | — |
| — | — O-8-27045 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,949 | 2,955 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 153 | 11 | 200 S |
| 2.375 | 2,930 | — | — |
| 4.5 | 2,999 | 7.875 | 320 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 17, 1994 | Apr 13, 1994 | — |
| 00 | Dec 8, 1993 | Oct 13, 1981 | — |
| 00 | Jan 12, 1984 | Oct 13, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-31286 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-31286 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 70.4K
- bbl, last 12 reported months
- 441K
- bbl, all reported
- Sep 1999
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000081683 | H-1 Injection | Plugged Apr 17, 2000 | 500 | 1,450 | 2,949–2,955 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 70,382 · prior 12 97,085(-28%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43331286, documented in the API reference.