WELL · 42-433-31332 · DISTRICT 7

Lola F. Ganaway '311' #1

Plugged

Stonewall County  · Vertical

Lola F. Ganaway '311' #1 (API 42-433-31332) is a plugged well in Stonewall County, plugged March 11, 1982, last operated by Halliburton Operating Company.

The RRC has issued 2 drilling permits between 1981 and 2013, permitted to 6,595 ft.

Completion filings report 2 formation tops, including Coleman Junction, Top Of Noodle Creek.

Operator of record

Halliburton Operating Company

Plano, TX · P-5 Y, filed Oct 4, 2025 · 108 permits on file · (214) 662-1405

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHalliburton Operating CompanySep 12, 2013
6,595
total depth, ft
2
permits on file
Sep 12, 2013
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2015 THROUGH Oct 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 11, 1982

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lola F. Ganaway '311' O-8-32009Rough Draw (Noodle Creek)Halliburton Operating Company100Feb 2015 – Oct 2016

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
769566-99ReenterHalliburton Operating CompanySep 5, 2013Sep 12, 2013Nov 1, 20136,595
137273-99DrillBandera Energy CompanyOct 20, 1981Oct 20, 1981Feb 15, 19826,595

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-32009————

Formation tops

As filed on W-2/G-1. Subsea from 1,816 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionTOP OF COLEMAN JUNCTION3,009-1,193
Coleman JunctionBASE OF COLEMAN JUNCTION3,120-1,304
Top of Noodle Creek3,506-1,690

Perforations

Perforated and open-hole intervals.

FromToType
3,5183,565Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62535411250 S
7.8753,7664.5265 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 1, 2016Jun 15, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43331332, documented in the API reference.