WELL · 42-433-31797 · DISTRICT 7

Abernathy #2 #2

Plugged

Stonewall County · Pumphrey (Strawn 5200) field  · Vertical

Abernathy #2 #2 (API 42-433-31797) is a plugged well in Stonewall County, plugged February 13, 2002, last operated by Tonk Creek Oil Company.

The RRC has issued one drilling permit, issued February 13, 1984, permitted to 6,352 ft.

Operator of record

Tonk Creek Oil Company

Aspermont, TX · P-5 Y, filed Jan 4, 2013 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTonk Creek Oil Company
Production reportsnone
Latest permitTonk Creek Oil CompanyFeb 13, 1984
6,352
total depth, ft
1
permits on file
Feb 13, 1984
last permit issued
Nov 18, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 18, 1984
Shut in
—
Plugged
Feb 13, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Abernathy #2 O-8-21936Pumphrey (Strawn 5200)Tonk Creek Oil Company100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
229213-99DrillTonk Creek Oil CompanyDec 14, 1984Feb 13, 1984Mar 13, 19846,352

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-21936————

Perforations

Perforated and open-hole intervals.

FromToType
5,2565,266Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516812.25150 S
4.56,3527.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 18, 1985Dec 13, 1984—
00Jan 9, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43331797, documented in the API reference.