WELL · 42-433-32445 · DISTRICT 7
Pittcock "A" #7701
Stonewall County · Vertical
Pittcock "A" #7701 (API 42-433-32445) is a permitted well in Stonewall County filed by Anathema, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1988 and 1989, permitted to 2,999 ft.
Completion filings report one formation top, including Geneview (Tannehill).
Its 2 leases have reported 190K barrels of oil and 41 mcf of gas since January 1993, last reporting in July 2026. The leases carry 17 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Jul 7, 1995 · 72 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Big al Oil and Gasthrough Apr 2026 |
| Latest permit | Anathema, Inc.Jul 12, 1989 |
- 2,999
- total depth, ft
- 2
- permits on file
- Jul 12, 1989
- last permit issued
- —
- completed
- 190K
- cumulative oil, bbl
- 41
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 17 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State of Texas Tannehill Unit O-8-27908 | Geneview (Tannehill) | Big al Oil and Gas | 15 | 178K | 0 | Jul 1996 – Jul 2026 |
| Pittcock "A" O-8-25190 | Geneview (Tannehill) | Coalinga Corporation | 2 | 12.8K | 41 | Jan 1993 – Oct 1996 |
Oil, barrels lease total
Last 12 months 498 · prior 12 1,095(-55%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anathema, Inc.Jan 1993 → Dec 1994
- 2Lomax Operating Company, Inc.Feb 1995 → Feb 1995
- 3Coalinga CorporationMar 1995 → Aug 1998
- 4Merit Energy CompanySep 1998 → Aug 2000
- 5Journey Operating, L.L.C.Sep 2000 → Dec 2003
- 6Alexander Resources, Inc.Jan 2004 → Jan 2012
- 7Waco Petro, LPFeb 2012 → Nov 2012
- 8Big al Oil and GasDec 2012 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 361349-99 | Recompletion | Anathema, Inc. | Jul 10, 1989 | Jul 12, 1989 | — | 2,999 |
| 352893-99 | Drill | Anathema, Inc. | Nov 1, 1988 | Nov 3, 1988 | — | 2,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-25190 | — | — | — | — |
| — | — O-8-27908 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,576 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Geneview (Tannehill) | 2,778 | -1,202 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,778 | 2,780 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 108 | 12.25 | 75 S |
| 5.5 | 2,838 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 23, 1996 | Dec 16, 1988 | Yes |
| 00 | Feb 1, 1989 | Dec 16, 1988 | Yes |
| 00 | Dec 23, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-32445 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-32445 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43332445, documented in the API reference.