WELL · 42-433-32659 · DISTRICT 7

Northwest Sagerton Unit #1

Plugged

Stonewall County · Amy B. (Jud Sand) field  · Vertical

Northwest Sagerton Unit #1 (API 42-433-32659) is a plugged well in Stonewall County, plugged July 10, 2013, last operated by Sojourner Drilling Corporation.

The RRC has issued one drilling permit, issued November 6, 1990, permitted to 5,100 ft.

It was permitted by Fisher, Jack Inc. and has since transferred to Sojourner Drilling Corporation on the wellbore schedule.

Completion filings report 4 formation tops, including B/Coleman Junction, T/Saddle Creek, T/Cisco, T/Jud Sand.

Its 2 leases have reported 251K barrels of oil and 52.3K mcf of gas since January 1993, last reporting in July 2026. The leases carry 14 wells, so these are lease totals, not this well alone.

Operator of record

Sojourner Drilling Corporation

Permitted by Fisher, Jack Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Dec 2025
Latest permitFisher, Jack Inc.Nov 6, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,100
total depth, ft
1
permits on file
Nov 6, 1990
last permit issued
Jun 27, 1997
completed
251K
cumulative oil, bbl
52.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 27, 1997
Shut in
—
Plugged
Jul 10, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Northwest Sagerton Unit O-8-28108Amy B. (Jud Sand)Sojourner Drilling Corporation13234K38.5KJan 1997 – Jul 2026
Lohrman O-8-25995Amy B. (Jud Sand)Fisher, Jack Inc.117.9K13.9KJan 1993 – May 1997

Oil, barrels lease total

Last 12 months 347 · prior 12 632(-45%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fisher, Jack Inc.Jan 1993 → Sep 2001
  2. 2Lariat Land & Exploration, Inc.Oct 2001 → May 2013
  3. 3Cinnabar Energy, Ltd.Jun 2013 → Dec 2016
  4. 4Double M Petroproperties, Inc.Jan 2017 → May 2018
  5. 5Sojourner Drilling CorporationJun 2018 → Dec 2025
  6. 6L.C.S. Production CompanyMay 2019 → Apr 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
380412-99DrillFisher, Jack Inc.Oct 31, 1990Nov 6, 1990Nov 12, 19905,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-25995————
—— O-8-28108————

Formation tops

As filed on W-2/G-1. Subsea from 1,564 ft elevation.Download CSV →

FormationMD ftSubsea
B/Coleman Junction2,123-559
T/Saddle Creek2,565-1,001
T/Cisco2,772-1,208
T/Jud Sand4,982-3,418

Perforations

Perforated and open-hole intervals.

FromToType
4,9824,989Open hole
4,982—Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516812.25120 S
4.54,9827.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 18, 1997Jul 16, 1997—
00Apr 2, 1997Dec 10, 1990Yes
00Jan 31, 1991Dec 10, 1990Yes
00Jan 11, 1991—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

9.84K
bbl, last 12 reported months
495K
bbl, all reported
Sep 2012
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000086243H-1 InjectionPlugged Jul 26, 20134502,4754,982–4,989

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 9,840 · prior 12 19,719(-50%)

01K2K3K20112012

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43332659, documented in the API reference.