WELL · 42-433-32671 · DISTRICT 7

Abernathy C.G. #2

Plugged

Stonewall County · Charles Abernathy (Bend Congl.) field  · Vertical

Abernathy C.G. #2 (API 42-433-32671) is a plugged well in Stonewall County, plugged January 23, 2002, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued December 10, 1990, permitted to 6,200 ft.

It was permitted by Crego Exploration and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Completion filings report 4 formation tops, including Dotham Lime, Strawn, Caddo, Bend.

Its lease has reported 368 barrels of oil and 155 mcf of gas since January 1993, last reporting in February 2002. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Smith Pipe of Abilene

Permitted by Crego Exploration; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jul 3, 2024 · (325) 665-4407

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsCrego Explorationthrough Feb 1995
Latest permitCrego ExplorationDec 10, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,200
total depth, ft
1
permits on file
Dec 10, 1990
last permit issued
Aug 8, 1992
completed
368
cumulative oil, bbl
155
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 8, 1992
Shut in
—
Plugged
Jan 23, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Abernathy, C.G. O-8-25910Charles Abernathy (Bend Congl.)Smith Pipe of Abilene2368155Jan 1993 – Feb 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crego ExplorationJan 1993 → Feb 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
382187-99DrillCrego ExplorationDec 10, 1990Dec 10, 1990Dec 13, 19906,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-25910————

Formation tops

As filed on W-2/G-1. Subsea from 1,740 ft elevation.Download CSV →

FormationMD ftSubsea
Dotham Lime2,730-990
StrawnSTRAWN LIME5,232-3,492
CaddoCADDO LIME5,950-4,210
BendBEND CONGL.6,110-4,370

Perforations

Perforated and open-hole intervals.

FromToType
6,0856,116Perforated
6,0856,116Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517012.25125 S
4.56,0857.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 10, 1992Oct 26, 1992—
00Mar 6, 1991Feb 19, 1991Yes
00Feb 22, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

28.2K
bbl, last 12 reported months
193K
bbl, all reported
Sep 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077018H-1 InjectionPlugged Feb 5, 20022501,7506,085–6,116

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 28,154 · prior 12 13,865(+103%)

02K4K6K19992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43332671, documented in the API reference.