WELL · 42-433-32793 · DISTRICT 7
Martin A.D. #1
Stonewall County · Bob Cat Canyon (Tannehill) field · Vertical
Martin A.D. #1 (API 42-433-32793) is a plugged well in Stonewall County, plugged May 18, 2012, last operated by Mwl Energy LLC.
The RRC has issued one drilling permit, issued July 2, 1992, permitted to 3,100 ft.
It was permitted by Anathema, Inc. and has since transferred to Mwl Energy LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Noodle Creek, Noodle Crk.
Its lease has reported 369K barrels of oil and 212 mcf of gas since January 1993, last reporting in July 2026. The lease carries 12 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Anathema, Inc.; the EWA schedule now lists a different operator.
Hamlin, TX · P-5 Y, filed Jun 4, 2026 · (254) 541-6390
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | MWL Energy LLC |
| Production reports | MWL Energy LLCthrough Apr 2026 |
| Latest permit | Anathema, Inc.Jul 2, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,100
- total depth, ft
- 1
- permits on file
- Jul 2, 1992
- last permit issued
- Sep 25, 1997
- completed
- 369K
- cumulative oil, bbl
- 212
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 25, 1997
- Shut in
- —
- Plugged
- May 18, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Martin, A.D. O-8-26634 | Bob Cat Canyon (Tannehill) | MWL Energy LLC | 12 | 369K | 212 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 12 · prior 12 12(+0%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anathema, Inc.Jan 1993 → Dec 1994
- 2Lomax Operating Company, Inc.Jan 1995 → Jun 2011
- 3Salida Exploration, LLCJul 2011 → Sep 2018
- 4MWL Energy LLCOct 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 400719-99 | Drill | Anathema, Inc. | Jun 30, 1992 | Jul 2, 1992 | Jul 24, 1992 | 3,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-26634 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,629 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Noodle Creek | 2,828 | -1,199 |
| Noodle CRK | 2,828 | -1,199 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,903 | 2,907 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 170 | 11 | 100 S |
| 4.5 | 2,990 | 7.875 | 290 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 9, 1998 | Oct 8, 1997 | — |
| 00 | Dec 8, 1997 | Sep 8, 1997 | — |
| 00 | Oct 7, 1997 | Jul 9, 1997 | — |
| 00 | Oct 9, 1992 | Aug 20, 1992 | Yes |
| 00 | Sep 3, 1992 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-32793 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-32793 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 41.9K
- bbl, last 12 reported months
- 792K
- bbl, all reported
- Sep 2012
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000086699 | H-1 Injection | Plugged Jul 20, 2012 | 500 | 1,450 | 2,903–2,907 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 41,865 · prior 12 42,664(-2%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43332793, documented in the API reference.