WELL · 42-433-33124 · DISTRICT 7
Iou Ranch #2
Stonewall County · Clarence-May (Tannehill) field · Shut IN · Vertical
Iou Ranch #2 (API 42-433-33124) is a well in Stonewall County operated by Clear Fork Incorporated, completed January 15, 1998 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued November 20, 1997, permitted to 3,600 ft.
It was permitted by Burger, F.W. Inc. and has since transferred to Clear Fork Incorporated on the wellbore schedule.
Completion filings report 2 formation tops, including Dothan, Tannehill.
Its lease has reported 1.11K barrels of oil since March 1998, last reporting in July 2026.
Operator of record
Permitted by Burger, F.W. Inc.; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Dec 4, 2025 · 472 permits on file · (325) 725-2652
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Clear Fork Incorporated |
| Production reports | Leclair Operating Co., Inc.through Dec 2008 |
| Latest permit | Burger, F.W. Inc.Nov 20, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,600
- total depth, ft
- 1
- permits on file
- Nov 20, 1997
- last permit issued
- Jan 15, 1998
- completed
- 1.11K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 15, 1998
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Iou Ranch O-8-28442 | Clarence-May (Tannehill) | Clear Fork, Incorporated | 1 | 1.11K | 0 | Mar 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Burger, F.W. Inc.Apr 1998 → Aug 2004
- 2Leclair Operating Co., Inc.Jun 2008 → Dec 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 470324-99 | Drill | Burger, F.W. Inc. | Nov 20, 1997 | Nov 20, 1997 | Nov 29, 1997 | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28442 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,839 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Dothan | 3,161 | -1,322 |
| Tannehill | 3,320 | -1,481 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,326 | 3,328 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 124 | 12.25 | 110 S |
| 4.5 | 3,410 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 24, 1998 | May 15, 1998 | — |
| 00 | May 7, 1998 | Apr 15, 1998 | Yes |
| 00 | Apr 24, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-33124 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-33124 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43333124, documented in the API reference.