WELL · 42-433-33230 · DISTRICT 7

Smith Walter Unit #17

Plugged

Stonewall County · Mengel E. (Canyon Sand) field  · Vertical

Smith Walter Unit #17 (API 42-433-33230) is a plugged well in Stonewall County, plugged June 10, 2010, last operated by L.C.S. Production Company.

The RRC has issued one drilling permit, issued February 7, 2001, permitted to 4,600 ft.

It was permitted by Walter Exploration Inc. and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report 2 formation tops, including T/Coleman Jct, T/Coleman Junction.

Its lease has reported 369K barrels of oil and 66.8K mcf of gas since December 1998, last reporting in July 2026. The lease carries 19 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Permitted by Walter Exploration Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitWalter Exploration Inc.Feb 7, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
1
permits on file
Feb 7, 2001
last permit issued
Mar 7, 2001
completed
369K
cumulative oil, bbl
66.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 7, 2001
Shut in
—
Plugged
Jun 10, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Walter Unit O-8-28573Mengel, E. (Canyon Sand)L.C.S. Production Company19369K66.8KDec 1998 – Jul 2026

Oil, barrels lease total

Last 12 months 284 · prior 12 1,120(-75%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Walter Exploration Inc.Dec 1998 → Sep 2001
  2. 2Walter Exploration CompanyOct 2001 → Sep 2013
  3. 3Foundation Energy Management LLCOct 2013 → Nov 2022
  4. 4L.C.S. Production CompanyDec 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
505010-99DrillWalter Exploration Inc.Feb 7, 2001Feb 7, 2001Feb 12, 20014,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28573————

Formation tops

As filed on W-2/G-1. Subsea from 1,754 ft elevation.Download CSV →

FormationMD ftSubsea
T/Coleman JCT2,050-296
T/Coleman Junction2,050-296

Perforations

Perforated and open-hole intervals.

FromToType
4,3874,403Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517312.25120 S
4.54,5667.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 20, 2003Jan 16, 2003—
00Jul 11, 2001May 10, 2001Yes
00Jun 1, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
274K
bbl, all reported
Sep 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091764H-1 InjectionPlugged Jul 8, 20105002,0004,387–4,403

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 33,446(-100%)

02K4K6K20092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43333230, documented in the API reference.