WELL · 42-433-33238 · DISTRICT 7

Smith I. E. #21

Plugged

Stonewall County · Mengel (Canyon) field  · Vertical

Smith I. E. #21 (API 42-433-33238) is a plugged well in Stonewall County, plugged May 23, 2018, last operated by L.C.S. Production Company.

The RRC has issued one drilling permit, issued May 23, 2001, permitted to 4,900 ft.

It was permitted by Walter Exploration Inc. and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report one formation top, including Coleman Junction.

Its lease has reported 385K barrels of oil and 145K mcf of gas since January 1993, last reporting in July 2026. The lease carries 25 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Permitted by Walter Exploration Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitWalter Exploration Inc.May 23, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
1
permits on file
May 23, 2001
last permit issued
Jun 18, 2001
completed
385K
cumulative oil, bbl
145K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 18, 2001
Shut in
—
Plugged
May 23, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 25 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, I. E. O-8-8690Mengel (Canyon)L.C.S. Production Company25385K145KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,801 · prior 12 1,579(+14%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Martin Oil Co.Jan 1993 → Dec 1997
  2. 2Walter Exploration Inc.Jan 1998 → Sep 2001
  3. 3Walter Exploration CompanyOct 2001 → Sep 2013
  4. 4Foundation Energy Management LLCOct 2013 → Aug 2018
  5. 5L.C.S. Production CompanyFeb 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
509312-99DrillWalter Exploration Inc.May 23, 2001May 23, 2001Jun 1, 20014,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-8690————

Formation tops

As filed on W-2/G-1. Subsea from 1,782 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction2,000-218

Perforations

Perforated and open-hole intervals.

FromToType
4,3084,417Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516612.25120 S
4.54,5927.875570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 6, 2001Jun 21, 2001Yes
00Jun 27, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091364H-1 InjectionPlugged Jul 10, 20185001,5004,308–4,417

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43333238, documented in the API reference.