WELL · 42-433-33332 · DISTRICT 7

Willow Creek #5

Plugged

Stonewall County · Mengel E. (Canyon Sand) field  · Vertical

Willow Creek #5 (API 42-433-33332) is a plugged well in Stonewall County, plugged October 4, 2017, last operated by L.C.S. Production Company.

The RRC has issued one drilling permit, issued July 11, 2006, permitted to 4,800 ft.

It was permitted by Walter Exploration Company and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report one formation top, including B/Gunsight.

Its lease has reported 62.2K barrels of oil and 27.6K mcf of gas since October 2003, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Permitted by Walter Exploration Company; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitWalter Exploration CompanyJul 11, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,800
total depth, ft
1
permits on file
Jul 11, 2006
last permit issued
May 7, 2007
completed
62.2K
cumulative oil, bbl
27.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 7, 2007
Shut in
—
Plugged
Oct 4, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Willow Creek O-8-29303Mengel, E. (Canyon Sand)L.C.S. Production Company762.2K27.6KOct 2003 – Jul 2026

Oil, barrels lease total

Last 12 months 718 · prior 12 707(+2%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Walter Exploration CompanyOct 2003 → Sep 2013
  2. 2Foundation Energy Management LLCOct 2013 → Nov 2022
  3. 3L.C.S. Production CompanyDec 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619198-99DrillWalter Exploration CompanyMay 12, 2006Jul 11, 2006—4,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-29303————

Formation tops

As filed on W-2/G-1. Subsea from 1,773 ft elevation.Download CSV →

FormationMD ftSubsea
B/Gunsight3,665-1,892

Perforations

Perforated and open-hole intervals.

FromToType
4,2724,351Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517012.25120 S
5.54,5377.875500 S
4.54,5377.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 12, 2008Nov 26, 2007—
00Mar 26, 2007Sep 1, 2006Yes
00Nov 17, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.94K
bbl, last 12 reported months
196K
bbl, all reported
Sep 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000097445H-1 InjectionPlugged Oct 20, 20175001,5004,272–4,351

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,936 · prior 12 7,558(-61%)

01K2K20162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43333332, documented in the API reference.