WELL · 42-433-34088 · DISTRICT 7

Jeff Smith #3

Y

Stonewall County · Guest (Canyon Sand) field · Injection  · Vertical

Jeff Smith #3 (API 42-433-34088) is a well in Stonewall County operated by Tacor Resources Inc, completed December 1, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued March 2, 2016, permitted to 5,100 ft.

Completion filings report 10 formation tops, including Coleman Junction, Swastika - Disposal, Noodle Creek Sand - Disposal, Cisco.

Its lease has reported 119K barrels of oil and 75.8K mcf of gas since August 2016, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 111K barrels injected in the 12 months reported through September 2025.

Operator of record

Tacor Resources Inc

Midland, TX · P-5 Y, filed Nov 4, 2025 · 29 permits on file · (432) 631-8074

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTacor Resources Inc
Production reportsTacor Resources Incthrough Apr 2026
Latest permitTacor Resources IncMar 2, 2016
5,100
total depth, ft
1
permits on file
Mar 2, 2016
last permit issued
Dec 1, 2022
completed
119K
cumulative oil, bbl
75.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jeff Smith O-8-32034Guest (Canyon Sand)Tacor Resources Inc9119K75.8KAug 2016 – Jul 2026

Oil, barrels lease total

Last 12 months 8,048 · prior 12 9,580(-16%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 5,240 · prior 12 6,939(-24%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tacor Resources IncAug 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
814134-99DrillTacor Resources IncMar 1, 2016Mar 2, 2016Jan 27, 20175,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-32034————

Formation tops

As filed on W-2/G-1. Subsea from 1,805 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction1,500305
Swastika - Disposal2,175-370
Noodle Creek Sand - Disposal2,740-935
CiscoCISCO - DISPOSAL3,040-1,235
Flippen - Disposal3,140-1,335
TannehillTANNEHILL - DISPOSAL3,300-1,495
Crystal Falls - Disposal3,340-1,535
Dothan Lime - Disposal3,390-1,585
Home Creek - Disposal3,940-2,135
Jones Sand - Disposal4,690-2,885

Perforations

Perforated and open-hole intervals.

FromToType
4,5824,590Perforated
4,9004,908Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517012.2594 S
5.55,0357.875635 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 5, 2023Dec 7, 2022—
00Mar 10, 2017Mar 9, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

111K
bbl, last 12 reported months
319K
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000118916H-1 InjectionActive1,0002,2004,500–4,950

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 111,306 · prior 12 125,435(-11%)

05K10K15K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43334088, documented in the API reference.