WELL · 42-435-39179 · DISTRICT 9

Morriss 63 #9SW

N

Sutton County  · Vertical

Morriss 63 #9SW (API 42-435-39179) is a former disposal or injection well in Sutton County, last operated by Highmount Expl & Prod Texas LLC; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued June 12, 2009, permitted to 8,250 ft.

Operator of record

Highmount Expl & Prod Texas LLC

Houston, TX · P-5 Y, filed Jun 3, 2016 · 1,184 permits on file · (325) 387-3588

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHighmount Expl & Prod Texas LLCJun 12, 2009
8,250
total depth, ft
1
permits on file
Jun 12, 2009
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
682039-99DrillHighmount Expl & Prod Texas LLCJun 11, 2009Jun 12, 2009—8,250

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000101095H-1 InjectionCanceled Feb 6, 20176,0003,3006,600–8,000

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43539179, documented in the API reference.