WELL · 42-439-31593 · DISTRICT 9
Linear Park #2H
Tarrant County · Newark East (Barnett Shale) field · Horizontal
Linear Park #2H (API 42-439-31593) is a horizontal well in Tarrant County operated by Chesapeake Operating Inc., completed April 1, 2008.
The RRC has issued one drilling permit (amended once), issued April 19, 2006, permitted to 10,500 ft.
Completion filings report 2 formation tops, including Atoka, Barnett.
No lease production has been reported under this well’s leases.
Operator of record
Oklahoma City, OK · P-5 Y, filed Jul 4, 2026 · 13,061 permits on file · (405) 935-7500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating Inc. |
| Production reports | Chesapeake Operating, Inc.through Jun 2012 |
| Latest permit | Dale Operating CompanyApr 19, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 2
- permits on file
- Apr 19, 2006
- last permit issued
- Apr 1, 2008
- completed
- 0
- cumulative oil, bbl
- 191K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 1, 2008
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Linear Park G-13-237772 | Newark, East (Barnett Shale) | TEP Barnett USA, LLC | 1 | 0 | 153K | Apr 2007 – Jul 2026 |
| Linear Park G-13-239540 | Newark, East (Barnett Shale) | Chesapeake Operating, Inc. | 1 | 0 | 38.5K | Apr 2008 – Apr 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.Apr 2008 → Jun 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 617831-98 | Drill | Chesapeake Operating, Inc. | Jan 16, 2007 | Apr 19, 2006 | Mar 27, 2007 | 9,000 |
| 617831-99 | Drill | Dale Operating Company | Apr 19, 2006 | Apr 19, 2006 | — | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-237772 | — | — | — | — |
| — | — G-13-239540 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 490 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,766 | 8,564 | Perforated |
| 8,812 | 9,607 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,655 | 12.25 | 629 S |
| 5.5 | 9,719 | 8.75 | 1,190 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 11, 2008 | Jun 12, 2008 | — |
| 00 | Oct 4, 2008 | — | — |
| 00 | Sep 4, 2008 | Mar 6, 2008 | Yes |
| 00 | Aug 8, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-439-31593 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-439-31593 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43931593, documented in the API reference.