WELL · 42-439-31801 · DISTRICT 9

FW SWD #1

WaterY

Tarrant County · Newark East (Barnett Shale) field · Injection  · Vertical

FW Swd #1 (API 42-439-31801) is a well in Tarrant County operated by Bkv North Texas LLC, completed January 17, 2025 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 24, 2006, permitted to 12,000 ft.

It was permitted by Diamondback-Disposal, L.P. and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report one formation top, including Ellenburger.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 845K barrels injected in the 12 months reported through September 2025.

Operator of record

BKV North Texas LLC

Permitted by Diamondback-Disposal, L.P.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Mar 4, 2026 · 22 permits on file · (835) 425-8677

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsnone
Latest permitDiamondback-Disposal, L.P.Oct 24, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Oct 24, 2006
last permit issued
Jan 17, 2025
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 17, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
FW SWD O-13-30841Newark, East (Barnett Shale)BKV North Texas, LLC100Aug 2007 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
627990-98DrillDiamondback-Disposal, L.P.Mar 29, 2007Oct 24, 2006May 17, 200712,000
627990-99DrillBenco Operating, Inc.Oct 24, 2006Oct 24, 2006—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-30841————

Formation tops

As filed on W-2/G-1. Subsea from 833 ft elevation.Download CSV →

FormationMD ftSubsea
EllenburgerELLENBERGER8,490-7,657

Perforations

Perforated and open-hole intervals.

FromToType
8,53510,114Perforated
8,53610,114Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,01112.25345 S
710,5738.75820 S
7—8.75860 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 3, 2025Apr 2, 2025—
00Dec 13, 2007Oct 4, 2007—
00Nov 5, 2007Sep 19, 2007Yes
00Oct 1, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

845K
bbl, last 12 reported months
17.5M
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096924W-14 DisposalActive30,0003,6008,500–12,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 845,474 · prior 12 795(+106249%)

050K100K150K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43931801, documented in the API reference.