WELL · 42-439-31852 · DISTRICT 9

Royal Arch #1H

Plugged

Tarrant County · Newark East (Barnett Shale) field  · Horizontal

Royal Arch #1H (API 42-439-31852) is a plugged horizontal well in Tarrant County, plugged February 21, 2024, last operated by Tep Barnett USA LLC.

The RRC has issued one drilling permit (amended 4 times), issued November 21, 2006, permitted to 13,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Atoka, Barnett.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Feb 4, 2026 · 371 permits on file · (877) 814-2034

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Jul 2019
Latest permitChesapeake Operating, Inc.Nov 21, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
5
permits on file
Nov 21, 2006
last permit issued
Dec 31, 2010
completed
0
cumulative oil, bbl
1.33M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2008 THROUGH Feb 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 31, 2010
Shut in
—
Plugged
Feb 21, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Royal Arch G-13-246422Newark, East (Barnett Shale)TEP Barnett USA, LLC101.33MSep 2008 – Feb 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Dec 2010 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jul 2017
  3. 3TEP Barnett USA, LLCAug 2017 → Jul 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
629371-95DrillChesapeake Operating, Inc.Sep 15, 2008Nov 21, 2006Aug 17, 200813,000
629371-96DrillChesapeake Operating, Inc.Aug 21, 2008Nov 21, 2006Aug 17, 200813,000
629371-97DrillMetroplex Barnett Shale LLCJul 29, 2008Nov 21, 2006Aug 17, 200813,000
629371-98DrillMetroplex Barnett Shale LLCJan 2, 2007Nov 21, 2006—13,000
629371-99DrillHarding CompanyNov 21, 2006Nov 21, 2006—13,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-246422————

Formation tops

As filed on W-2/G-1. Subsea from 631 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA LIME7,499-6,868
AtokaBASAL ATOKA8,097-7,466
BarnettUPPER BARNETT8,249-7,618
BarnettLOWER BARNETT8,321-7,690

Perforations

Perforated and open-hole intervals.

FromToType
8,6339,656Perforated
8,63310,926Perforated
9,90410,926Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,87312.25545 S
5.511,0398.75885 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 26, 2011Apr 28, 2011—
00May 12, 2009Jan 7, 2009Yes
00Apr 17, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43931852, documented in the API reference.