WELL · 42-439-33187 · DISTRICT 9

Pyramid Acres Unit 4 #403H

Plugged

Tarrant County · Newark East (Barnett Shale) field  · Horizontal

Pyramid Acres Unit 4 #403H (API 42-439-33187) is a plugged horizontal well in Tarrant County, plugged January 10, 2019, last operated by Enervest Operating L.L.C..

The RRC has issued one drilling permit, issued March 13, 2008, permitted to 9,000 ft.

It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Enervest Operating L.L.C. on the wellbore schedule.

Completion filings report 2 formation tops, including Marble Falls, Barnett.

Operator of record

Enervest Operating L.L.C.

Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 4, 2025 · 1,249 permits on file · (713) 659-3500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnervest Operating L.L.C.
Production reportsEncana Oil & Gas(usa) Inc.through Mar 2010
Latest permitEncana Oil & Gas(usa) Inc.Mar 13, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Mar 13, 2008
last permit issued
Jun 2, 2008
completed
0
cumulative oil, bbl
98.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2008 THROUGH Jan 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 2, 2008
Shut in
—
Plugged
Jan 10, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pyramid Acres Unit 4 G-13-244532Newark, East (Barnett Shale)Enervest Operating, L.L.C.1098.1KJun 2008 – Jan 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encana Oil & Gas(usa) Inc.Nov 2008 → Mar 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
656483-99DrillEncana Oil & Gas(usa) Inc.Mar 3, 2008Mar 13, 2008Apr 7, 20089,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-244532————

Formation tops

As filed on W-2/G-1. Subsea from 929 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls6,052-5,123
Barnett6,816-5,887
BarnettBARNETT SHALE6,866-5,937

Perforations

Perforated and open-hole intervals.

FromToType
7,72110,423Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,09212.25410 S
5.510,5008.751,160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 6, 2009Dec 1, 2008Yes
00Feb 2, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43933187, documented in the API reference.