WELL · 42-439-34779 · DISTRICT 9
Lost Creek #C 1
Tarrant County · Newark East (Barnett Shale) field · Directional
Lost Creek #C 1 (API 42-439-34779) is a plugged well in Tarrant County, plugged May 19, 2023, last operated by TC Oil And Gas LLC.
The RRC has issued one drilling permit (amended once), issued January 26, 2010, permitted to 6,720 ft.
It was permitted by Ops Group Limited and has since transferred to TC Oil And Gas LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Akota Sand, Marble Falls, Barnett.
Operator of record
Permitted by Ops Group Limited; the EWA schedule now lists a different operator.
Denton, TX · P-5 Y, filed Feb 4, 2026 · (214) 407-4525
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TC Oil and Gas LLC |
| Production reports | Owl Creek Operating Co., Inc.through Nov 2020 |
| Latest permit | Ops Group LimitedJan 26, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,720
- total depth, ft
- 2
- permits on file
- Jan 26, 2010
- last permit issued
- Feb 24, 2011
- completed
- 0
- cumulative oil, bbl
- 77.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 24, 2011
- Shut in
- —
- Plugged
- May 19, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lost Creek G-13-261422 | Newark, East (Barnett Shale) | TC Oil and Gas, LLC | 1 | 0 | 77.5K | Nov 2010 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ops Group LimitedMar 2011 → Jun 2012
- 2Arrowhead Productions, LPApr 2014 → Jun 2015
- 3Owl Creek Operating Co., Inc.Jan 2017 → Nov 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 690180-98 | Drill | Ops Group Limited | Nov 10, 2010 | Jan 26, 2010 | Oct 26, 2010 | 6,720 |
| 690180-99 | Drill | Trio Consulting & Management,llc | Jan 22, 2010 | Jan 26, 2010 | Oct 26, 2010 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-261422 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 834 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Akota Sand | 4,838 | -4,004 |
| Marble Falls | 5,910 | -5,076 |
| BarnettBARNETT SHALE | 6,640 | -5,806 |
| Akota Sand | — | — |
| BarnettBARNETT SHALE | — | — |
| Marble Falls | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,644 | 6,650 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,005 | 12.25 | 440 S |
| 5.5 | 6,720 | 7.875 | 560 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 8, 2012 | Mar 11, 2011 | — |
| 00 | Nov 30, 2011 | Feb 9, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-439-34779 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-439-34779 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43934779, documented in the API reference.