WELL · 42-441-01124 · DISTRICT 7
Allyn Fred #1
Taylor County · Taylor County Regular field · Vertical
Allyn Fred #1 (API 42-441-01124) is a plugged well in Taylor County, plugged July 22, 2003, last operated by Morita Energy LLC.
The RRC has issued one drilling permit, issued June 2, 1982, permitted to 4,200 ft.
It was permitted by Cedar Oil Company and has since transferred to Morita Energy LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Coleman Junction, Saddle Creek, Flippen Sand Top, Cook Sand Top.
Operator of record
Permitted by Cedar Oil Company; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed May 8, 2010
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Morita Energy LLC |
| Production reports | none |
| Latest permit | Cedar Oil CompanyJun 2, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,200
- total depth, ft
- 1
- permits on file
- Jun 2, 1982
- last permit issued
- Oct 15, 1982
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 15, 1982
- Shut in
- —
- Plugged
- Jul 22, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Allyn, Fred O-8-19646 | Taylor County Regular | Morita Energy, LLC | 1 | 0 | 0 | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 162505-99 | Other | Cedar Oil Company | Jun 2, 1982 | Jun 2, 1982 | — | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-19646 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,100 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionCOLEMAN JUNCTION TOP | 1,580 | 520 |
| Saddle CreekSADDLE CREEK TOP | 2,421 | -321 |
| Flippen Sand Top | 2,450 | -350 |
| Cook Sand Top | 2,504 | -404 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,456 | 2,460 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 61 | 11.5 | — |
| 4.5 | 2,601 | 6.75 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 24, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-441-01124 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-441-01124 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 280K
- bbl, all reported
- Dec 1998
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000046827 | H-1 Injection | Plugged Jul 25, 2003 | 0 | 0 | 0–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 1,400(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44101124, documented in the API reference.