WELL · 42-441-02738 · DISTRICT 7

Guitar Earl B. #171WI

Plugged

Taylor County · Miracle (Tannehill) field  · Vertical

Guitar Earl B. #171WI (API 42-441-02738) is a plugged well in Taylor County, plugged September 22, 2017, last operated by Production Operators Of TX LLC.

The RRC has issued one drilling permit (amended once), issued July 15, 2011, permitted to 2,386 ft.

It was permitted by L.C.S. Production Company and has since transferred to Production Operators Of TX LLC on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its lease has reported 55.6K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Production Operators of TX LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jun 4, 2026 · 7 permits on file · (325) 668-8087

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProduction Operators of TX LLC
Production reportsProduction Operators of TX, LLCthrough Apr 2026
Latest permitL.C.S. Production CompanyJul 15, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,386
total depth, ft
2
permits on file
Jul 15, 2011
last permit issued
Aug 2, 2011
completed
55.6K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 2, 2011
Shut in
—
Plugged
Sep 22, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guitar Earl B. O-8-13067Miracle (Tannehill)Production Operators of TX, LLC855.6K19Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,700 · prior 12 1,346(+26%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Smith Production Inc.Jan 1993 → Feb 1994
  2. 2DWR Oil CompanyMar 1994 → Mar 2002
  3. 3D. W. R. Oil Co., Inc.Apr 2002 → Aug 2025
  4. 4L.C.S. Production CompanyDec 2007 → Aug 2014
  5. 5Mid-Con Energy Operating, LLCSep 2014 → Aug 2017
  6. 6Production Operators of TX, LLCSep 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
720309-98ReenterL.C.S. Production CompanyJul 20, 2011Jul 15, 2011Jul 20, 20112,386
720309-99ReenterL.C.S. Production CompanyJul 14, 2011Jul 15, 2011—2,386

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-13067————

Formation tops

As filed on W-2/G-1. Subsea from 1,869 ft elevation.Download CSV →

FormationMD ftSubsea
TannehillTANNEHILL SAND2,363-494

Perforations

Perforated and open-hole intervals.

FromToType
2,3632,378Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7510713.37575 S
5.52,1397.875435 S
5.52,3857.87550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 21, 2012Aug 30, 2011—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

46.3K
bbl, last 12 reported months
414K
bbl, all reported
Dec 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102631H-1 InjectionPlugged Oct 4, 20172509501,900–2,386

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 46,309 · prior 12 23,496(+97%)

05K10K20162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44102738, documented in the API reference.