WELL · 42-441-30191 · DISTRICT 7
Bettes Joe 150 H #2W
Taylor County · Taylor County Regular field · Shut IN · Vertical
Bettes Joe 150 H #2W (API 42-441-30191) is a well in Taylor County operated by Bustamante Resources LLC, completed June 15, 1982 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued April 7, 1982, permitted to 3,050 ft.
It was permitted by Chalmers Operating CO., Inc. and has since transferred to Bustamante Resources LLC on the wellbore schedule.
Completion filings report one formation top, including Flippen Sand.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit.
Operator of record
Permitted by Chalmers Operating Co., Inc.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Mar 4, 2026 · (432) 664-1103
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bustamante Resources LLC |
| Production reports | none |
| Latest permit | Chalmers Operating Co., Inc.Apr 7, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,050
- total depth, ft
- 1
- permits on file
- Apr 7, 1982
- last permit issued
- Jun 15, 1982
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 15, 1982
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bettes, Joe 150 H O-8-18329 | Taylor County Regular | Bustamante Resources LLC | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 155801-99 | Other | Chalmers Operating Co., Inc. | Apr 7, 1982 | Apr 7, 1982 | — | 3,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-18329 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,276 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Flippen Sand | 3,006 | -730 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,006 | 3,016 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 286 | 10 | 200 S |
| 4.5 | 3,005 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 13, 1984 | Nov 18, 1983 | — |
| 00 | Mar 8, 1984 | Nov 18, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-441-30191 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-441-30191 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.65M
- bbl, all reported
- Dec 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000047165 | H-1 Injection | Active | 150 | 1,100 | 3,005–3,016 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 25,928(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44130191, documented in the API reference.