WELL · 42-441-30393 · DISTRICT 7

Allyn, Mary Elizabeth #1

N

Taylor County  · Vertical

Allyn, Mary Elizabeth #1 (API 42-441-30393) is a permitted well in Taylor County filed by Cedar Oil Company; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1979 and 1982, permitted to 4,300 ft.

Completion filings report 7 formation tops, including Coleman Junction, Tannehill, Saddle Creek, Flippen.

Its lease has reported 4.29K barrels of oil and 71 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Cedar Oil Company

Midland, TX · P-5 Y, filed Nov 4, 1994 · 9 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsRichman Petroleum Corp.through Jul 1999
Latest permitCedar Oil CompanyMar 18, 1982
4,300
total depth, ft
2
permits on file
Mar 18, 1982
last permit issued
—
completed
4.29K
cumulative oil, bbl
71
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Allyn, Mary Elizabeth O-8-19433Taylor County RegularMorita Energy, LLC34.29K71Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cedar Oil CompanyJan 1993 → Jan 1993
  2. 2Chase Operating CompanyFeb 1993 → Apr 1995
  3. 3Neal, Jack Engineering, Inc.May 1995 → Jul 1998
  4. 4American EnergyAug 1998 → Feb 1999
  5. 5Richman Petroleum Corp.Apr 1999 → Jul 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
153823-99OtherCedar Oil CompanyOct 24, 1983Mar 18, 1982—4,300
63108-99OtherJLH CorporationNov 7, 1979Nov 7, 1979—3,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-19433————

Formation tops

As filed on W-2/G-1. Subsea from 2,138 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction1,650488
Tannehill2,370-232
Saddle Creek2,480-342
Flippen2,506-368
Cook2,562-424
McMillan3,242-1,104
Dog Bend4,138-2,000

Perforations

Perforated and open-hole intervals.

FromToType
2,5162,520Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625109——
4.54,2487.875575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 14, 1984Oct 27, 1983—
00Mar 8, 1984Oct 27, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44130393, documented in the API reference.