WELL · 42-441-31406 · DISTRICT 7

Rehab #1

N

Taylor County · Taylor County Regular field  · Vertical

Rehab #1 (API 42-441-31406) is a well in Taylor County operated by Bullet Development LLC, completed April 1, 2001.

The RRC has issued one drilling permit, issued June 15, 1979, permitted to 2,000 ft.

It was permitted by Davis Brothers and has since transferred to Bullet Development LLC on the wellbore schedule.

Its 2 leases have reported 32.5K barrels of oil and 50 mcf of gas since January 1993, last reporting in July 2026. The leases carry 12 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Bullet Development LLC

Permitted by Davis Brothers; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Mar 4, 2026 · 57 permits on file · (325) 829-0357

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBullet Development LLC
Production reportsBullet Development, LLCthrough Apr 2026
Latest permitDavis BrothersJun 15, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Jun 15, 1979
last permit issued
Apr 1, 2001
completed
32.5K
cumulative oil, bbl
50
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 2001
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wtrc O-8-30212Taylor County RegularBullet Development, LLC817.4K0Sep 2008 – Jul 2026
Rehab O-8-15698Taylor County RegularBullet Development, LLC415.1K50Jan 1993 – Sep 2015

Oil, barrels lease total

Last 12 months 775 · prior 12 897(-14%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hickory Petroleum Inc.Jan 1993 → Mar 1993
  2. 2Jones, Jansen M.Apr 1993 → Jul 2006
  3. 3Number One Oil & GasAug 2006 → Oct 2009
  4. 4P.B. Blue Dot PropertiesNov 2008 → Apr 2009
  5. 5Bullet Development, LLCMay 2009 → Apr 2026
  6. 6Southern Crude, Inc.Nov 2009 → Mar 2011
  7. 7Viathon Hydrocarbons, Inc.Apr 2011 → Feb 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
50865-99DrillDavis BrothersJun 15, 1979Jun 15, 1979Jun 20, 19792,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-15698————
—— O-8-15698————
—— O-8-30212————

Perforations

Perforated and open-hole intervals.

FromToType
1,7961,800Perforated
—1,800Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510211110 S
2.3751,809——
4.51,9647.875325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 12, 2015May 11, 2001—
00Dec 11, 2001May 11, 2001—
00Nov 29, 2001Jan 15, 1980—
00Jan 12, 1984Jan 15, 1980—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
281K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000045840H-1 InjectionActive000–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44131406, documented in the API reference.