WELL · 42-441-31657 · DISTRICT 7

Holley #1

Plugged

Taylor County  · Vertical

Holley #1 (API 42-441-31657) is a plugged well in Taylor County, plugged September 16, 1980, last operated by Tex-Star Petroleum Inc..

The RRC has issued 2 drilling permits between 1980 and 1981, permitted to 4,700 ft.

Completion filings report one formation top, including Fry.

Operator of record

Tex-Star Petroleum Inc.

Abilene, TX · P-5 Y, filed Sep 13, 1985 · 8 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTex-Star Petroleum Inc.Aug 11, 1981
4,700
total depth, ft
2
permits on file
Aug 11, 1981
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 16, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
130319-99OtherTex-Star Petroleum Inc.Aug 11, 1981Aug 11, 1981—4,700
88365-99DrillStroube & ReiffJul 31, 1980Jul 31, 1980Aug 29, 19804,700

Formation tops

As filed on W-2/G-1. Subsea from 2,016 ft elevation.Download CSV →

FormationMD ftSubsea
Fry4,595-2,579

Perforations

Perforated and open-hole intervals.

FromToType
4,5124,526Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251331180 S
2.3754,475——
4.54,7007.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Oct 14, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44131657, documented in the API reference.