WELL · 42-441-32258 · DISTRICT 7
McAninch Ted #4
Taylor County · Salt Branch field · Vertical
Mcaninch Ted #4 (API 42-441-32258) is a plugged well in Taylor County, plugged March 27, 1989, last operated by Mcaninch Transport CO. Inc..
The RRC has issued 2 drilling permits between 1982 and 1987, permitted to 2,600 ft.
Completion filings report 2 formation tops, including Flippen, Hope.
Operator of record
Merkel, TX · P-5 Y, filed Nov 8, 1991 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | McAninch Transport Co. Inc. |
| Production reports | none |
| Latest permit | McAninch Transport Co., Inc.Mar 31, 1987 |
- 2,600
- total depth, ft
- 2
- permits on file
- Mar 31, 1987
- last permit issued
- May 11, 1987
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 11, 1987
- Shut in
- —
- Plugged
- Mar 27, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 328161-99 | Recompletion | McAninch Transport Co., Inc. | Mar 24, 1987 | Mar 31, 1987 | — | 2,600 |
| 172542-99 | Drill | Ellis, William E. | Sep 22, 1982 | Sep 22, 1982 | — | 2,600 |
Formation tops
As filed on W-2/G-1. Subsea from 1,748 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Flippen | 2,325 | -577 |
| Hope | 2,570 | -822 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,325 | 2,335 | Perforated |
| 2,576 | 2,579 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 120 | 12.75 | 125 S |
| 2.375 | 2,590 | — | — |
| 4.5 | 2,619 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 24, 1987 | Sep 4, 1987 | — |
| 00 | Sep 15, 1987 | — | — |
| 00 | Jan 12, 1984 | Oct 12, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-441-32258 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-441-32258 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 7.49K
- bbl, last 12 reported months
- 7.49K
- bbl, all reported
- Apr 1988
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000062919 | H-1 Injection | Plugged Apr 3, 1989 | 1,200 | 1,150 | 2,325–2,335 |
MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS
Last 12 months 7,490
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44132258, documented in the API reference.