WELL · 42-441-33085 · DISTRICT 7

Moore #1

Plugged

Taylor County · Gibson field  · Vertical

Moore #1 (API 42-441-33085) is a plugged well in Taylor County, plugged June 29, 2011, last operated by Permian Legend LLC.

The RRC has issued one drilling permit, issued December 27, 1985, permitted to 2,950 ft.

It was permitted by Rutledge, Gerald and has since transferred to Permian Legend LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Dothan, Flippen, Ivan.

Operator of record

Permian Legend LLC

Permitted by Rutledge, Gerald; the EWA schedule now lists a different operator.

San Marcos, TX · P-5 Y, filed Feb 3, 2012 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePermian Legend LLC
Production reportsnone
Latest permitRutledge, GeraldDec 27, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,950
total depth, ft
1
permits on file
Dec 27, 1985
last permit issued
Oct 1, 1990
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 1, 1990
Shut in
—
Plugged
Jun 29, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Moore O-8-24946GibsonPermian Legend LLC100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
293588-99DrillRutledge, GeraldDec 23, 1985Dec 27, 1985—2,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24946————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Dothan2,270
Flippen2,586
Ivan2,840

Perforations

Perforated and open-hole intervals.

FromToType
2,2702,275Perforated
2,2702,930Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251251295 S
4.52,9427.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 3, 1991Jun 13, 1991—
00Jul 21, 1988May 18, 1988—
00Jul 2, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.37M
bbl, all reported
Dec 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000067232H-1 InjectionPlugged Feb 13, 20121,5001,1002,270–2,930

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44133085, documented in the API reference.