WELL · 42-441-33157 · DISTRICT 7

Henslee Walter #2

Y

Taylor County · Taylor County Regular field · Injection  · Vertical

Henslee Walter #2 (API 42-441-33157) is a well in Taylor County operated by Powell A. Brandt CO., completed January 4, 2011 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 3, 1986, permitted to 2,550 ft.

It was permitted by Powell, A. Brandt and has since transferred to Powell A. Brandt CO. on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its lease has reported 71.1K barrels of oil and 192 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 28.7K barrels injected in the 12 months reported through December 2025.

Operator of record

Powell A. Brandt Co.

Permitted by Powell, A. Brandt; the EWA schedule now lists a different operator.

Hawley, TX · P-5 Y, filed Dec 4, 2025 · 1 permits on file · (325) 370-9779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePowell A. Brandt Co.
Production reportsPowell, A. Brandt Co.through Apr 2026
Latest permitPowell, A. BrandtSep 3, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,550
total depth, ft
1
permits on file
Sep 3, 1986
last permit issued
Jan 4, 2011
completed
71.1K
cumulative oil, bbl
192
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 4, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henslee, Walter O-8-23907Taylor County RegularPowell, A. Brandt Co.271.1K192Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,230 · prior 12 2,467(-10%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Powell, A. BrandtJan 1993 → Mar 1999
  2. 2Powell, A. Brandt Co.Apr 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
320061-99DrillPowell, A. BrandtSep 2, 1986Sep 3, 1986—2,550

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23907————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Tannehill2,412

Perforations

Perforated and open-hole intervals.

FromToType
2,4122,418Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62514512.25110 S
4.52,4817.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 3, 2023Jan 11, 2023—
00Jul 16, 1987Jul 1, 1987Yes
00Jul 9, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

28.7K
bbl, last 12 reported months
856K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000062930H-1 InjectionActive1,0005502,412–2,418

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 28,665 · prior 12 31,350(-9%)

02K4K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44133157, documented in the API reference.