WELL · 42-441-33193 · DISTRICT 7

Potosi (Jennings Lime) Unit #1

Plugged

Taylor County · Potosi (Jennings) field  · Vertical

Potosi (Jennings Lime) Unit #1 (API 42-441-33193) is a plugged well in Taylor County, plugged November 13, 1996, last operated by Delray Oil Inc..

The RRC has issued one drilling permit, issued February 5, 1987, permitted to 3,850 ft.

It was permitted by De Soto Operating Company and has since transferred to Delray Oil Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Capps, Jennings.

Its 2 leases have reported 10.8K barrels of oil and 46 mcf of gas since January 1993, last reporting in January 1997. The leases carry 11 wells, so these are lease totals, not this well alone.

Operator of record

Delray Oil Inc.

Permitted by DE Soto Operating Company; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Dec 4, 2025 · 665 permits on file · (210) 260-9491

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDelray Oil Inc.
Production reportsDelray Oil, Inc.through Oct 1996
Latest permitDE Soto Operating CompanyFeb 5, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,850
total depth, ft
1
permits on file
Feb 5, 1987
last permit issued
Jan 20, 1993
completed
10.8K
cumulative oil, bbl
46
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 20, 1993
Shut in
—
Plugged
Nov 13, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Potosi (Jennings Lime) Unit O-8-26733Potosi (Jennings)Delray Oil, Inc.1010.8K46Jan 1993 – Jan 1997
Freeman O-8-24231Potosi (Jennings)Delray Oil, Inc.100Jan 1993 – Feb 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Delray Oil, Inc.Jan 1993 → Oct 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
326046-99DrillDE Soto Operating CompanyFeb 2, 1987Feb 5, 1987—3,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24231————
—— O-8-26733————

Formation tops

As filed on W-2/G-1. Subsea from 1,811 ft elevation.Download CSV →

FormationMD ftSubsea
Capps3,636-1,825
Jennings3,726-1,915

Perforations

Perforated and open-hole intervals.

FromToType
3,7683,778Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251351190 S
4.53,8707.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 1993Feb 12, 1993—
00Dec 10, 1992Mar 12, 1987Yes
00Mar 26, 1987Mar 12, 1987Yes
00Mar 18, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

137K
bbl, last 12 reported months
563K
bbl, all reported
Dec 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000076665H-1 InjectionPlugged Dec 2, 19967501,8003,768–3,778

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 136,903 · prior 12 169,832(-19%)

010K20K19951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44133193, documented in the API reference.