WELL · 42-441-33788 · DISTRICT 7

Hughes #2

Plugged

Taylor County  · Vertical

Hughes #2 (API 42-441-33788) is a plugged well in Taylor County, plugged September 27, 1996, last operated by Schkade Bros. Operating Company.

The RRC has issued 3 drilling permits between 1996 and 2010, permitted to 3,500 ft.

Completion filings report 4 formation tops, including Coleman Junction, B/Coleman Junction, Dothan Lime, Tannehill.

Its lease has reported 1.63M barrels of oil and 70.4K mcf of gas since December 1995, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Schkade Bros. Operating Company

Abilene, TX · P-5 Y, filed Jul 8, 2022 · 184 permits on file · (325) 668-7367

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSojourner Drilling Corporationthrough Apr 2026
Latest permitSchkade Bros. Operating CompanyDec 29, 2010
3,500
total depth, ft
3
permits on file
Dec 29, 2010
last permit issued
—
completed
1.63M
cumulative oil, bbl
70.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 27, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hughes O-8-27726Carl Worsham Catclaw (Tannehill)Sojourner Drilling Corporation71.63M70.4KDec 1995 – Jul 2026

Oil, barrels lease total

Last 12 months 48,303 · prior 12 44,319(+9%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Schkade Bros. Operating CompanyDec 1995 → Oct 2021
  2. 2Sojourner Drilling CorporationNov 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
707231-99ReclassSchkade Bros. Operating CompanyDec 16, 2010Dec 29, 2010Jul 1, 20002,365
493680-99ReenterSchkade Bros. Operating CompanyMar 31, 2000Apr 10, 2000Jul 1, 20003,500
450355-99DrillSchkade Bros. Operating CompanyJul 15, 1996Jul 23, 1996Sep 23, 19962,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27726————

Formation tops

As filed on W-2/G-1. Subsea from 1,685 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionBASE OF COLEMAN JUNCTION1,290395
B/Coleman Junction1,290395
Dothan Lime1,348337
Tannehill1,830-145

Perforations

Perforated and open-hole intervals.

FromToType
1,8371,845Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510712.2580 S
4.52,1227.875270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 28, 2011Jan 5, 2011—
00Oct 12, 2001Nov 14, 2000—
00Aug 1, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090368H-1 InjectionActive08001,837–1,845

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44133788, documented in the API reference.