WELL · 42-441-33995 · DISTRICT 7
Ledbetter Ranch E #1
Taylor County · Taylor County Regular field · Injection · Vertical
Ledbetter Ranch E #1 (API 42-441-33995) is a well in Taylor County operated by Grayrock Energy II LLC, completed January 2, 2002 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued February 15, 2001, permitted to 3,200 ft.
It was permitted by Guffey, WM. R. and has since transferred to Grayrock Energy II LLC on the wellbore schedule.
Completion filings report one formation top, including Upper Cook.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 10.4K barrels injected in the 12 months reported through December 2025.
Operator of record
Permitted by Guffey, Wm. R.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Aug 4, 2025 · (214) 234-9115
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Grayrock Energy II LLC |
| Production reports | none |
| Latest permit | Guffey, Wm. R.Feb 15, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 1
- permits on file
- Feb 15, 2001
- last permit issued
- Jan 2, 2002
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 2, 2002
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ledbetter Ranch "E" O-8-28994 | Taylor County Regular | Grayrock Energy II, LLC | 1 | 0 | 0 | Jul 2001 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 505203-99 | Drill | Guffey, Wm. R. | Feb 12, 2001 | Feb 15, 2001 | Feb 23, 2001 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28994 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,316 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Upper Cook | 2,937 | -621 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,937 | 2,939 | Perforated |
| 2,938 | 2,940 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 256 | 11 | 140 S |
| 5.5 | 2,970 | 7.875 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 18, 2002 | Feb 4, 2002 | — |
| 00 | Aug 24, 2001 | Jul 19, 2001 | Yes |
| 00 | Jul 31, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-441-33995 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-441-33995 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 10.4K
- bbl, last 12 reported months
- 182K
- bbl, all reported
- Dec 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000091731 | H-1 Injection | Active | 1,200 | 1,468 | 2,937–2,940 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 10,398 · prior 12 5,436(+91%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44133995, documented in the API reference.