WELL · 42-441-34267 · DISTRICT 7
Oliver #4
Taylor County · Big Easy (Palo Pinto) field · Producing · Vertical
Oliver #4 (API 42-441-34267) is a well in Taylor County operated by 4t Production LLC, completed August 3, 2009 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued May 15, 2009, permitted to 4,000 ft.
It was permitted by Pace Operating and has since transferred to 4t Production LLC on the wellbore schedule.
Completion filings report 3 formation tops, including U Flippen, Pay 10 Lime, L/Palo Pinto.
Its lease has reported 6.44K barrels of oil and 2.78K mcf of gas since August 2009, last reporting in July 2026.
Operator of record
Permitted by Pace Operating; the EWA schedule now lists a different operator.
Buffalo Gap, TX · P-5 Y, filed Mar 4, 2026 · (325) 280-3136
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | 4T Production LLC |
| Production reports | 4T Production LLCthrough Apr 2026 |
| Latest permit | Pace OperatingMay 15, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- May 15, 2009
- last permit issued
- Aug 3, 2009
- completed
- 6.44K
- cumulative oil, bbl
- 2.78K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 3, 2009
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Oliver O-8-30386 | Big Easy (Palo Pinto) | 4T Production LLC | 1 | 6.44K | 2.78K | Aug 2009 – Jul 2026 |
Oil, barrels lease total
Last 12 months 12 · prior 12 8(+50%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pace OperatingAug 2009 → Feb 2015
- 2Bluff Creek Petroleum, LLCJun 2018 → Feb 2024
- 34T Production LLCSep 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 680943-99 | Drill | Pace Operating | May 4, 2009 | May 15, 2009 | Jun 16, 2009 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-30386 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,768 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| U Flippen | 1,794 | -26 |
| Pay 10 Lime | 3,246 | -1,478 |
| L/Palo Pinto | 3,396 | -1,628 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,476 | 3,482 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 131 | 12.25 | 75 S |
| 4.5 | 3,653 | 7.875 | 150 S |
| 4.5 | — | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 26, 2009 | Aug 18, 2009 | Yes |
| 00 | Sep 18, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-441-34267 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-441-34267 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44134267, documented in the API reference.