WELL · 42-441-34428 · DISTRICT 7
Henson #1
Taylor County · Taylor County Regular field · Vertical
Henson #1 (API 42-441-34428) is a well in Taylor County operated by Blackrock Drilling LLC, completed August 4, 2013.
The RRC has issued 2 drilling permits between 2013 and 2015, permitted to 2,300 ft.
Completion filings report 3 formation tops, including Saddle Creek, Flippen Lime, Cook Sand.
Its 2 leases have reported 23.5K barrels of oil since August 2013, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Mar 4, 2026 · 9 permits on file · (325) 829-7553
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Blackrock Drilling LLC |
| Production reports | Lawrence Energy Companythrough Mar 2026 |
| Latest permit | Blackrock Drilling, LLCAug 6, 2015 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,300
- total depth, ft
- 2
- permits on file
- Aug 6, 2015
- last permit issued
- Aug 4, 2013
- completed
- 23.5K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 4, 2013
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Henson O-8-31461 | Taylor County Regular | Blackrock Drilling, LLC | 1 | 5.06K | 0 | Aug 2013 – Jul 2026 |
| Henson O-8-31908 | Dudley (Flippen Sand) | Lawrence Energy Company | 4 | 18.4K | 0 | Aug 2013 – Jul 2026 |
Oil, barrels lease total
Last 12 months 186 · prior 12 415(-55%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Blackrock Drilling, LLCAug 2013 → Jun 2023
- 2Lawrence Energy CompanyJul 2023 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 809021-99 | Field transfer | Blackrock Drilling, LLC | Jul 31, 2015 | Aug 6, 2015 | Jul 5, 2013 | 2,300 |
| 764652-99 | Drill | Blackrock Drilling, LLC | Jun 14, 2013 | Jun 14, 2013 | Jul 5, 2013 | 2,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31461 | — | — | — | — |
| — | — O-8-31908 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,255 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Saddle Creek | 1,961 | 294 |
| Flippen Lime | 2,000 | 255 |
| Cook Sand | 2,190 | 65 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,196 | 2,200 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 200 | 12.25 | 150 S |
| 4.5 | 2,272 | 6.75 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 17, 2015 | Dec 14, 2015 | Yes |
| 00 | May 1, 2014 | Aug 27, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-441-34428 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-441-34428 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44134428, documented in the API reference.