WELL · 42-441-34447 · DISTRICT 7

Henson #3

Y

Taylor County · Dudley (Flippen Sand) field · Injection  · Vertical

Henson #3 (API 42-441-34447) is a well in Taylor County operated by Lawrence Energy Company, completed September 4, 2015 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 25, 2013, permitted to 2,300 ft.

It was permitted by Blackrock Drilling, LLC and has since transferred to Lawrence Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Saddle Creek, Flippen Lime, Cook Sand.

Its lease has reported 18.4K barrels of oil since August 2013, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Lawrence Energy Company

Permitted by Blackrock Drilling, LLC; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Oct 4, 2025 · 34 permits on file · (817) 706-5665

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLawrence Energy Company
Production reportsLawrence Energy Companythrough Mar 2026
Latest permitBlackrock Drilling, LLCSep 25, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,300
total depth, ft
2
permits on file
Sep 25, 2013
last permit issued
Sep 4, 2015
completed
18.4K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 4, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henson O-8-31908Dudley (Flippen Sand)Lawrence Energy Company418.4K0Aug 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 186 · prior 12 415(-55%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Blackrock Drilling, LLCDec 2013 → Jun 2023
  2. 2Lawrence Energy CompanyJul 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
770404-98DrillBlackrock Drilling, LLCAug 6, 2015Sep 25, 2013Oct 5, 20132,300
770404-99DrillBlackrock Drilling, LLCSep 19, 2013Sep 25, 2013—2,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-31908————

Formation tops

As filed on W-2/G-1. Subsea from 2,245 ft elevation.Download CSV →

FormationMD ftSubsea
Saddle Creek1,961284
Flippen Lime2,18263
Cook Sand2,22520

Perforations

Perforated and open-hole intervals.

FromToType
2,1822,200Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520312.25160 S
4.52,2606.75200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 5, 2026Mar 11, 2026—
00Feb 17, 2016Dec 18, 2015—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
177K
bbl, all reported
Dec 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112847H-1 InjectionActive4001,0912,182–2,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44134447, documented in the API reference.