WELL · 42-441-34464 · DISTRICT 7
Teaff #1
Taylor County · Taylor County Regular field · Producing · Vertical
Teaff #1 (API 42-441-34464) is a well in Taylor County operated by Salida Exploration LLC, completed July 29, 2014 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued March 21, 2014, permitted to 5,000 ft.
Completion filings report 10 formation tops, including Coleman Junction, Saddle Creek, Flippen - Disposal, Cook - Disposal.
Its lease has reported 39.4K barrels of oil since July 2014, last reporting in July 2026.
Operator of record
Abilene, TX · P-5 Y, filed Mar 4, 2026 · 82 permits on file · (325) 668-2398
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Salida Exploration LLC |
| Production reports | Salida Exploration, LLCthrough Mar 2026 |
| Latest permit | Salida Exploration, LLCMar 21, 2014 |
- 5,000
- total depth, ft
- 1
- permits on file
- Mar 21, 2014
- last permit issued
- Jul 29, 2014
- completed
- 39.4K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 29, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Teaff O-8-31545 | Taylor County Regular | Salida Exploration, LLC | 1 | 39.4K | 0 | Jul 2014 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2,096 · prior 12 2,713(-23%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Salida Exploration, LLCJul 2014 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 781302-99 | Drill | Salida Exploration, LLC | Mar 5, 2014 | Mar 21, 2014 | Mar 26, 2014 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-31545 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,852 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE, SW | 1,650 | 202 |
| Saddle CreekSADDLE CREEK - DISPOSAL | 2,230 | -378 |
| Flippen - Disposal | 2,250 | -398 |
| Cook - Disposal | 2,350 | -498 |
| Hope Lime - Disposal | 2,500 | -648 |
| King Sand - Disposal | 2,560 | -708 |
| Swastika - Disposal | 2,700 | -848 |
| CiscoCISCO - DISPOSAL | 2,800 | -948 |
| Palo PintoPALO PINTO LIME - DISPOSAL | 3,400 | -1,548 |
| Unidentified-County Regular - DI | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,546 | 4,552 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 136 | 12.25 | 80 S |
| 5.5 | 4,547 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 6, 2014 | Jul 31, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-441-34464 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-441-34464 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44134464, documented in the API reference.