WELL · 42-441-34731 · DISTRICT 8

Cathodic Protection #30

N

Taylor County  · Vertical

Cathodic Protection #30 (API 42-441-34731) is a permitted well in Taylor County filed by Atmos Pipeline - Texas; no completion report is on file yet.

The RRC has issued one drilling permit, issued November 14, 2025, permitted to 550 ft.

Operator of record

Atmos Pipeline - Texas

Dallas, TX · P-5 Y, filed Jun 4, 2026 · 96 permits on file · (800) 442-7259

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitAtmos Pipeline - TexasNov 14, 2025
550
total depth, ft
1
permits on file
Nov 14, 2025
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

32.462299, -99.794357

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Taylor County.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
911395-99DrillAtmos Pipeline - TexasOct 27, 2025Nov 14, 2025—550

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well has no tops filed, so it cannot anchor a section; its neighbours can.

Section of the neighbours →

East Vogel Unit42-441-34686

4.0 KM · Sojourner Drilling Corporation · Section with this well →

Coleman Junction1,130561
Saddle Creek1,878-187
Flippen - Disposal1,940-249
Swastika - Disposal—
Cook - Disposal—
King Sand - Disposal—
Hope Lime - Disposal—
Palo Pinto—

10 TOPS · FIRST 8

Cactus A42-441-34593

5.1 KM · Geosurveys, Inc. · Section with this well →

Coleman Junction1,330422
Saddle Creek2,234-482
Flippen - Disposal2,384-632
Cook - Disposal2,476-724
Hope Lime - Disposal2,498-746
King Sand - Disposal2,545-793
Cisco3,280-1,528
Palo Pinto3,720-1,968

10 TOPS · FIRST 8

Kincaid, W. T.42-441-02423

8.6 KM · Winco Oil Inc. · Section with this well →

Cook Sand2,350-516
Flippen Lime2,380-546

City of Abilene42-441-34654

10.8 KM · Ledger Operating Corporation · Section with this well →

Coleman Junction984658
Cook - Disposal—
Saddle Creek—
Flippen - Disposal—
Hope Lime - Disposal—
Swastika - Disposal—
Unidentified-County Regular - DI—
King Sand - Disposal—

10 TOPS · FIRST 8

Lytle N-6842-441-34569

11.6 KM · Bullet Development, LLC · Section with this well →

Coleman Junction1,042681
Flippen - Disposal1,800-77
King Sand - Disposal—
Unidentified-County Regular - DI—
Swastika - Disposal—
Saddle Creek—
Palo Pinto—
Hope Lime - Disposal—

11 TOPS · FIRST 8

Teaff42-441-34336

12.6 KM · Winco Oil Inc. · Section with this well →

King Line2,532-738
King Lime2,532-738
Caddo4,972-3,178
Ellenburger5,106-3,312

Lytle42-441-34570

12.7 KM · Bullet Development, LLC · Section with this well →

Coleman Junction1,000739
Flippen - Disposal1,778-39
Hope Lime - Disposal1,918-179
Palo Pinto3,420-1,681
Cook - Disposal—
Swastika - Disposal—
Saddle Creek—
King Sand - Disposal—

10 TOPS · FIRST 8

Lytle42-441-34640

12.8 KM · Bullet Development, LLC · Section with this well →

Coleman Junction1,010728
Saddle Creek1,72018
Flippen - Disposal1,780-42
Hope Lime - Disposal1,895-157
Palo Pinto3,260-1,522
Cisco—
Swastika - Disposal—
King Sand - Disposal—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44134731, documented in the API reference.