WELL · 42-445-00063 · DISTRICT 8

Willard W. N. #1

N

Terry County · Wildcat field  · Vertical

Willard W. N. #1 (API 42-445-00063) is a well in Terry County operated by Amerada Hess Corporation, completed July 10, 1998.

The RRC has issued one drilling permit, issued May 27, 1998, permitted to 13,500 ft.

Completion filings report 4 formation tops, including Yates, San Andres, Strawn, Devonian.

Its 2 leases have reported 2.3M barrels of oil and 1.03M mcf of gas since January 1993, last reporting in July 2026. The leases carry 70 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Amerada Hess Corporation

Houston, TX · P-5 Y, filed Oct 6, 2006 · 835 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmerada Hess Corporation
Production reportsHilcorp Energy Companythrough Jul 2025
Latest permitAmerada Hess CorporationMay 27, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
1
permits on file
May 27, 1998
last permit issued
Jul 10, 1998
completed
2.3M
cumulative oil, bbl
1.03M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 10, 1998
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 70 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Adair Wolfcamp Unit O-11-9892Adair (Wolfcamp)Hilcorp Energy Company692.3M1.03MJan 1993 – Jul 2026
Willard, W. N. O-11-67968WildcatAmerada Hess Corporation100Aug 1998 – Nov 2005

Oil, barrels lease total

Last 12 months 2,137 · prior 12 6,178(-65%)

05001K202420252026

Gas, mcf lease total

Last 12 months 248 · prior 12 558(-56%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amerada Hess CorporationJan 1993 → Mar 2006
  2. 2OXY USA WTP LPApr 2006 → Jun 2006
  3. 3Apache CorporationJul 2006 → Nov 2024
  4. 4Hilcorp Energy CompanyDec 2024 → Jul 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
476551-99RecompletionAmerada Hess CorporationMay 22, 1998May 27, 1998Jun 20, 199813,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-9892————
—— O-11-67968————

Formation tops

As filed on W-2/G-1. Subsea from 3,238 ft elevation.Download CSV →

FormationMD ftSubsea
Yates3,073165
San Andres4,467-1,229
Strawn10,443-7,205
Devonian12,418-9,180

Perforations

Perforated and open-hole intervals.

FromToType
8,4808,556Perforated
8,4808,585Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37531817.5350 S
13.37531917.5350 S
8.6254,54911600 S
8.6254,54912.25600 S
5.58,6257.375600 S
5.58,6257.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 2020Nov 13, 2019—
00Jan 13, 2006Jul 8, 2005—
00Sep 10, 1998Aug 12, 1998Yes
00Sep 2, 1998——
00May 15, 1997Apr 9, 1997—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000118050H-1 InjectionActive12,5002,9255,850–13,450

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44500063, documented in the API reference.