WELL · 42-445-30815 · DISTRICT 8

Wellman SW. San Andres Unit #1

Plugged

Terry County · Wellman SW. (San Andres) field  · Vertical

Wellman SW. San Andres Unit #1 (API 42-445-30815) is a plugged well in Terry County, plugged December 20, 2012, last operated by Rein Pusher Operating LLC.

The RRC has issued one drilling permit, issued January 15, 1980, permitted to 5,600 ft.

It was permitted by Nrm Petroleum Corp. and has since transferred to Rein Pusher Operating LLC on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Its lease has reported 1.55M barrels of oil and 348K mcf of gas since January 1993, last reporting in July 2026. The lease carries 46 wells, so these are lease totals, not this well alone.

Operator of record

Rein Pusher Operating LLC

Permitted by NRM Petroleum Corp.; the EWA schedule now lists a different operator.

Brenham, TX · P-5 Y, filed Jul 4, 2026 · 1 permits on file · (512) 423-0058

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRein Pusher Operating LLC
Production reportsRein Pusher Operating LLCthrough Apr 2026
Latest permitNRM Petroleum Corp.Jan 15, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,600
total depth, ft
1
permits on file
Jan 15, 1980
last permit issued
Feb 21, 2007
completed
1.55M
cumulative oil, bbl
348K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 21, 2007
Shut in
—
Plugged
Dec 20, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 46 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wellman SW. San Andres Unit O-11-65039Wellman, SW. (San Andres)Rein Pusher Operating LLC461.55M348KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 8,682 · prior 12 11,069(-22%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Snyder Oil CorporationJan 1993 → Sep 1995
  2. 2Coda Energy, Inc.Oct 1995 → Aug 1998
  3. 3Belco Energy Corp.Sep 1998 → Feb 2002
  4. 4Westport Oil and Gas Company, LPMar 2002 → Dec 2004
  5. 5Texland Petroleum, L.P.Jan 2005 → Jul 2022
  6. 6Extex Operating CompanyAug 2022 → May 2024
  7. 7Double Barrel Oil LLCJun 2024 → Jul 2024
  8. 8Rein Pusher Operating LLCAug 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
70266-99DrillNRM Petroleum Corp.Jan 15, 1980Jan 15, 1980Feb 13, 19805,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-65039————

Formation tops

As filed on W-2/G-1. Subsea from 3,318 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,915-1,597
San AndresSAN ANDRES POROSITY5,492-2,174

Perforations

Perforated and open-hole intervals.

FromToType
5,4925,512Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62542211250 S
2.3755,515——
4.55,5247.8751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 28, 2008Mar 22, 2007—
00Oct 29, 1984Apr 3, 1980—
00Oct 16, 1984——
00Jan 12, 1984Apr 3, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

22.5K
bbl, last 12 reported months
287K
bbl, all reported
Nov 2012
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000097135H-1 InjectionPlugged Jan 4, 20131,0002,0005,492–5,512

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 22,505 · prior 12 62,096(-64%)

05K10K20112012

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44530815, documented in the API reference.