WELL · 42-445-30816 · DISTRICT 8
Pippin O. A. #1
Terry County · Tokio (Wolfcamp) field · Vertical
Pippin O. A. #1 (API 42-445-30816) is a plugged well in Terry County, plugged September 17, 1987, last operated by Mobil Producing TX. & N.M. Inc..
The RRC has issued 4 drilling permits between 1980 and 1984, permitted to 13,475 ft.
It was permitted by Superior Oil Company, The and has since transferred to Mobil Producing TX. & N.M. Inc. on the wellbore schedule.
Operator of record
Mobil Producing TX. & N.M. Inc.
Permitted by Superior Oil Company, The; the EWA schedule now lists a different operator.
Spring, TX · P-5 Y, filed May 4, 2026 · 6,763 permits on file · (281) 773-7706
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mobil Producing TX. & N.M. Inc. |
| Production reports | none |
| Latest permit | Superior Oil Company, TheMay 15, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,475
- total depth, ft
- 4
- permits on file
- May 15, 1984
- last permit issued
- Jun 14, 1983
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 14, 1983
- Shut in
- —
- Plugged
- Sep 17, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 238924-99 | Recompletion | Superior Oil Company, The | May 14, 1984 | May 15, 1984 | — | 9,300 |
| 197068-99 | Recompletion | Superior Oil Company, The | Jun 2, 1983 | Jun 2, 1983 | — | 13,475 |
| 96671-99 | Recompletion | Superior Oil Company, The | Oct 23, 1980 | Oct 23, 1980 | — | 13,475 |
| 69194-99 | Drill | Superior Oil Company, The | Jan 10, 1980 | Jan 10, 1980 | Mar 10, 1980 | 13,475 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,625 | 8,637 | Perforated |
| 9,959 | 9,983 | Perforated |
| 12,896 | 12,912 | Perforated |
| 13,326 | 13,340 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 516 | 17.5 | 550 S |
| 13.375 | 516 | — | 550 S |
| 8.625 | 4,973 | 11 | 2,065 S |
| 8.625 | 4,973 | — | 2,065 S |
| 2.875 | 5,020 | — | — |
| 5.5 | 6,718 | 7.875 | — |
| 2.875 | 9,013 | — | — |
| 2.375 | 10,097 | — | — |
| 5.5 | 13,475 | 7.625 | 775 S |
| 5.5 | 13,475 | — | 775 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 9, 1984 | Jun 26, 1984 | — |
| 00 | Aug 8, 1984 | Jun 26, 1984 | — |
| 00 | Jan 12, 1984 | Jun 24, 1983 | — |
| 00 | Jan 12, 1984 | Apr 30, 1981 | — |
| 00 | Jan 12, 1984 | May 30, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-445-30816 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-445-30816 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44530816, documented in the API reference.