WELL · 42-445-31091 · DISTRICT 8

Dakota A #1

Plugged

Terry County · Coroco SE. (Siluro-Devonian) field  · Vertical

Dakota A #1 (API 42-445-31091) is a plugged well in Terry County, plugged November 8, 1985, last operated by R K Petroleum Corp..

The RRC has issued 2 drilling permits between 1982 and 2009, permitted to 12,760 ft.

It was permitted by Blue Ridge Resources, LLC and has since transferred to R K Petroleum Corp. on the wellbore schedule.

Completion filings report 2 formation tops, including San Andres, Fusselman.

It holds an active disposal or injection permit, with 122K barrels injected in the 12 months reported through November 2025.

Operator of record

R K Petroleum Corp.

Permitted by Blue Ridge Resources, LLC; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Nov 4, 2025 · 530 permits on file · (432) 215-6708

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR K Petroleum Corp.
Production reportsnone
Latest permitBlue Ridge Resources, LLCFeb 2, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,760
total depth, ft
2
permits on file
Feb 2, 2009
last permit issued
Jan 30, 1983
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 30, 1983
Shut in
—
Plugged
Nov 8, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dakota A O-11-69422Coroco, SE. (Siluro-Devonian)Crey Oil & Gas LLC100Feb 2009 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
677986-99ReenterBlue Ridge Resources, LLCJan 28, 2009Feb 2, 2009Jan 9, 200912,760
176717-99DrillR K Petroleum CorporationNov 4, 1982Nov 4, 1982—12,760

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-69422————

Formation tops

As filed on W-2/G-1. Subsea from 3,383 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,908-1,525
Fusselman12,746-9,363

Perforations

Perforated and open-hole intervals.

FromToType
4,9504,970Perforated
4,95012,760Perforated
12,75012,760Perforated
12,75012,760Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37547217450 S
13.37547217.5450 S
8.6254,95011650 S
8.6254,95012.25650 S
2.37510,372——
5.512,7507.8751,000 S
5.5—7.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 2010Jun 30, 2009—
00Dec 29, 2009May 11, 2009Yes
00Oct 8, 2009——
00Jan 12, 1984Mar 17, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

122K
bbl, last 12 reported months
3.52M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000100638H-1 InjectionActive10,0002,4754,950–12,760

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 121,611 · prior 12 239,883(-49%)

020K40K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44531091, documented in the API reference.