WELL · 42-447-32149 · DISTRICT 7
Nichols, J. B. #25 WD
Throckmorton County · Vertical
Nichols, J. B. #25 WD (API 42-447-32149) is a plugged well in Throckmorton County, plugged March 27, 1980, last operated by Northwest Producing Properties.
The RRC has issued 2 drilling permits between 1980 and 1981, permitted to 5,053 ft.
Its lease has reported 24K barrels of oil and 34.8K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Northwest Producing Properties
Vancouver, WA · P-5 Y, filed Jun 15, 1982 · 8 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Synergy Operating Co., LLCthrough Nov 2018 |
| Latest permit | Northwest Producing PropertiesDec 15, 1981 |
- 5,053
- total depth, ft
- 2
- permits on file
- Dec 15, 1981
- last permit issued
- —
- completed
- 24K
- cumulative oil, bbl
- 34.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Mar 27, 1980
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nichols, J.B. O-8-15637 | Bryle (Miss) | North Texas Oil & Gas, LLC | 2 | 24K | 34.8K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lindsay, Robert L.Jan 1993 → May 1995
- 2Lindsay Oil OperationsJun 1995 → Feb 2004
- 3Synergy Operating Co., LLCMar 2004 → Nov 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 144237-99 | Reenter | Northwest Producing Properties | Dec 15, 1981 | Dec 15, 1981 | Jan 10, 1982 | 1,850 |
| 74334-99 | Drill | Northwest Producing Properties | Mar 6, 1980 | Mar 6, 1980 | — | 5,053 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-15637 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 864 | 884 | Perforated |
| 870 | 880 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 131 | 12.25 | 120 S |
| 4.5 | 1,850 | 7.875 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 5, 1991 | Jul 22, 1991 | — |
| 00 | Jul 9, 1991 | Jun 12, 1991 | Yes |
| 00 | Jun 27, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-32149 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-32149 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 513K
- bbl, all reported
- Aug 2022
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000076912 | W-14 Disposal | Canceled May 4, 2023 | 100 | 400 | 870–880 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44732149, documented in the API reference.