WELL · 42-447-33102 · DISTRICT 7

Matthews Watt R. Etal #14

Plugged

Throckmorton County · Throckmorton County Regular field  · Vertical

Matthews Watt R. Etal #14 (API 42-447-33102) is a plugged well in Throckmorton County, plugged July 17, 2024, last operated by Kerr Oilfield Company.

The RRC has issued one drilling permit, issued February 22, 1982, permitted to 1,100 ft.

It was permitted by Reef Oil Corporation and has since transferred to Kerr Oilfield Company on the wellbore schedule.

Completion filings report 5 formation tops, including Coleman Junction, Sedwick, Dothian, Saddle Creek.

Its lease has reported 88.9K barrels of oil and 3.42K mcf of gas since January 1993, last reporting in July 2026. The lease carries 13 wells, so these are lease totals, not this well alone.

Operator of record

Kerr Oilfield Company

Permitted by Reef Oil Corporation; the EWA schedule now lists a different operator.

Mineral Wells, TX · P-5 Y, filed Mar 4, 2026 · (817) 944-9491

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKerr Oilfield Company
Production reportsKerr Oilfield Companythrough Apr 2021
Latest permitReef Oil CorporationFeb 22, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,100
total depth, ft
1
permits on file
Feb 22, 1982
last permit issued
Jun 14, 2012
completed
88.9K
cumulative oil, bbl
3.42K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 14, 2012
Shut in
—
Plugged
Jul 17, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Matthews, Watt R., Etal O-8-4726Throckmorton County RegularKerr Oilfield Company1388.9K3.42KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Leffel's, Inc.Jan 1993 → Mar 2020
  2. 2Kerr Oilfield CompanyDec 2020 → Apr 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
151378-99DrillReef Oil CorporationFeb 22, 1982Feb 22, 1982Jan 27, 19821,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-4726————

Formation tops

As filed on W-2/G-1. Subsea from 1,357 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction3241,033
Sedwick487870
Dothian640717
Saddle Creek955402
Flippin Coal1,022335

Perforations

Perforated and open-hole intervals.

FromToType
955962Perforated
966974Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,0247.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 5, 2013Oct 1, 2012—
00Nov 16, 1992Oct 1, 1992Yes
00Oct 19, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

16.4K
bbl, last 12 reported months
329K
bbl, all reported
Aug 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074290H-1 InjectionPlugged Aug 21, 20241,500475955–1,010

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 16,400 · prior 12 68,833(-76%)

05K10K20192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44733102, documented in the API reference.