WELL · 42-447-33708 · DISTRICT 7
Brown-Condron-Davis #1
Throckmorton County · Condron (Congl.) field · Vertical
Brown-Condron-Davis #1 (API 42-447-33708) is a plugged well in Throckmorton County, plugged October 9, 2001, last operated by West Gordon T.JR. & Rugeley Stan.
The RRC has issued 2 drilling permits between 1983 and 1988, permitted to 4,700 ft.
Completion filings report 3 formation tops, including Caddo, Congl., Mississippian.
Its lease has reported 784 barrels of oil and 25.1K mcf of gas since January 1993, last reporting in March 2006.
Operator of record
West Gordon T.jr. & Rugeley Stan
Wichita Falls, TX · P-5 Y, filed Sep 2, 2016 · 43 permits on file · (940) 723-2177
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | West Gordon T.jr. & Rugeley Stan |
| Production reports | West,gordon T.jr. & Rugeley,stanthrough Dec 1996 |
| Latest permit | West,gordon T.jr. & Rugeley,stanDec 6, 1988 |
- 4,700
- total depth, ft
- 2
- permits on file
- Dec 6, 1988
- last permit issued
- Feb 1, 1984
- completed
- 784
- cumulative oil, bbl
- 25.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 1, 1984
- Shut in
- —
- Plugged
- Oct 9, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brown-Condron-Davis O-8-25236 | Condron (Caddo) | West,gordon T.jr. & Rugeley,stan | 1 | 784 | 25.1K | Jan 1993 – Mar 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1West,gordon T.jr. & Rugeley,stanJan 1993 → Dec 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 353952-99 | Recompletion | West,gordon T.jr. & Rugeley,stan | Dec 5, 1988 | Dec 6, 1988 | — | 4,626 |
| 203467-99 | Drill | West,gordon T.jr. & Rugeley,stan | Aug 1, 1983 | Aug 1, 1983 | — | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-25236 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,358 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 4,115 | -2,757 |
| Congl. | 4,496 | -3,138 |
| MississippianMISS | 4,602 | -3,244 |
| MississippianMISS. | 4,602 | -3,244 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,116 | 4,124 | Perforated |
| 4,496 | 4,508 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 200 | 12.25 | 150 S |
| 5.5 | 4,602 | 7.875 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 17, 1989 | Jan 18, 1989 | Yes |
| 00 | Feb 1, 1989 | — | — |
| 00 | Mar 27, 1984 | Mar 2, 1984 | — |
| 00 | Mar 20, 1984 | Mar 2, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-33708 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-33708 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44733708, documented in the API reference.